SCP-4375
Thaumiel
?
low confidence
SCP-4375
Expected annual
$35.0M
One-time setup
$1.6B
Annual recurring
$32.8M
Personnel
61
One-time capital is approximately $1.60B driven primarily by construction, 68 SRAs, YBOD development and spare-stockpile procurement; annual operating costs are about $32.84M/year driven by staff wages, power, replacement reserves, and ongoing R&D/monitoring.
One-Time Capital Costs
Total: $1.6B
Annual Recurring Costs
Total: $32.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$32.8M/yr
Normal uneventful year with regular operations, maintenance, and scheduled R&D; no major failures or deployments.
no major equipment failures
routine operations and R&D only
🚨
Minor Incident
$51.5M/yr
Localized equipment failure or partial SRA/YBOD fault requiring replacement of a single SRA or short-term YBOD repair, limited evacuation and increased legal/cover activity.
single-SRA failure
YBOD short-term outage
emergency evacuation activation
🚨
Major Breach
$279.8M/yr
Extended YBOD failure or coordinated damage causing multiple SRA failures and requiring large-scale replacement, emergency neutralization actions, major evacuation and extended legal/contingency operations.
YBOD destruction
multiple SRA failures
extended breach response
Personnel
61 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | [#9] 24/7 multi-shift armed security force with hazard/clearance premiums. |
| Technician / SRA Specialist | 15 | [#11, #2] On-site technicians for SRA/YBOD operation, calibration and emergency repairs. |
| Research Scientist | 8 | [#12, #26] Level 3+ researchers, postdocs and lab techs for ongoing research and R&D projects. |
| Engineer / Maintenance | 3 | [#4, #11] Engineers responsible for generators, UPS, HVAC and structural/system maintenance. |
| Medical Officer | 2 | [#8, #22] On-site medical staff for continuous care, emergency response and infirmary operations. |
| Administrative Staff | 2 | [#1, #14] Administrative and classified communications support, logistics coordination. |
| Site Director / Executive Staff | 1 | [#1, #15] Site leadership, O5 liaison and high-level oversight of operations and legal/cover engagements. |
Confidence Notes
Large ranges on SRAs, YBOD development, energy draw, spare needs and contingency sizing create high uncertainty; estimates use mid/high planning assumptions where indicated but true costs could vary materially.