SCP-4422
Safe
?
low confidence
SCP-4422
Expected annual
$263.5M
One-time setup
$205.8M
Annual recurring
$261.1M
Personnel
77
Initial capital and site acquisition are the dominant one-time costs (~$206M). Recurring annual costs are driven primarily by plant operation and energy/opportunity costs (~$261M/yr), with staffing, maintenance, R&D and monitoring as secondary drivers.
One-Time Capital Costs
Total: $205.8M
Annual Recurring Costs
Total: $261.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$261.1M/yr
Normal operational year with no major incidents; full cover operation and routine maintenance.
routine_operations
scheduled_maintenance
normal_research_activity
🚨
Minor Incident
$266.1M/yr
Localized accident or limited containment event requiring repairs, emergency response, and small legal/cleanup costs.
small_explosion
minor_toxic_release
localized_structural_damage
🚨
Major Breach
$361.1M/yr
Severe containment failure or explosion with mass casualties, large-scale contamination, major structural rebuilds and significant legal liability.
large_explosion
widespread_toxic_release
structural_collapse
Personnel
77 total
| Role | Count | Notes |
|---|---|---|
| Auxiliary Plant Staff | 25 | [#7] Routine cover employees operating the power plant; salaries and benefits included in staff_wages. |
| Research Scientist | 10 | [#8] Immediate research team, accelerator/tachyon specialists and temporal physicists; high salary bands and overhead accounted for in staff_wages. |
| Security Officer / MTF Agent | 36 | [#9] Armed guards, access control operators and supervisors for 24/7 coverage; training and equipment costs in staff_wages and recurring budgets. |
| On-call Specialists (anomalous-equipment) | 6 | [#10] Rapid-response anomalous-equipment and temporal incident specialists; on-call allowances and readiness included in staff_wages. |
Confidence Notes
Wide ranges in analyst estimates, large anomalous and bespoke engineering uncertainties, and operational model dependence (continuous operation vs intermittent use) reduce confidence; historical incident history indicates non-negligible tail risks.