SCP-4436
Safe
~
medium confidence
SCP-4436
Expected annual
$3.1M
One-time setup
$7.0M
Annual recurring
$3.0M
Personnel
20
Initial build and commissioning are capital‑intensive (high‑availability supercomputing, redundant hardware, secure site modifications); ongoing costs are driven by specialized personnel (Capuchin technicians, security, researchers), power/cooling, and cybersecurity/legal/cover maintenance.
One-Time Capital Costs
Total: $7.0M
Annual Recurring Costs
Total: $3.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.0M/yr
Normal operational year with no major incidents; routine maintenance, staffing, utilities, and monitoring costs only.
stable containment
regular maintenance
no security or data incidents
🚨
Minor Incident
$3.5M/yr
Moderate hardware failure or localized security/cyber incident requiring emergency replacement, forensic investigation, and contracted incident response.
rack‑level hardware failure
isolated malware/IDS event
small data integrity incident
🚨
Major Breach
$5.0M/yr
Significant data leakage, large‑scale hardware loss, or legal/diocesan exposure requiring multi‑layered emergency response, PR/legal engagement, hardware rebuild, and potential ecclesiastical remediation.
successful external compromise
major forensic/legal event
public disclosure requiring PR and legal action
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | 24/7 armed/cleared guard coverage for perimeter and server room (see #14). |
| Research Scientist | 3 | Neuroscience / computational cognition specialists working on SCP-4436 (see #22). |
| Engineer / Maintenance (Capuchin Technician) | 4 | Foundation IT/technician FTEs who are Capuchin friars; handle daily operations and rituals scheduling (see #15). |
| Monitoring / Audit Staff | 2 | Personnel for logging, audit, and compliance activities (see #23). |
| Chaplain/Abbot (Site Director) | 1 | Resident chaplain/abbot managing liturgy and canonical administration (see #18 and containment procedures). |
Confidence Notes
Analyst notes supply granular line items and ranges, enabling a reasoned estimate; uncertainty remains around actual compute footprint (which drives primary CAPEX/OPEX), diocesan negotiation complexity, and contingency usage, so confidence is medium.