SCP-449
Euclid
~
medium confidence
SCP-449
Expected annual
$9.6M
One-time setup
$6.5M
Annual recurring
$9.0M
Personnel
22
One-time setup costs are moderate-to-high (~$6.47M) driven by vault/lab buildouts and research seed funding; recurring annual operations are the main ongoing driver (~$9.01M/yr) dominated by the D-Class monitoring network, security, medical/rescue reserves and research operations.
One-Time Capital Costs
Total: $6.5M
Annual Recurring Costs
Total: $9.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.0M/yr
Normal year with routine monitoring, maintenance, expected transfers and no major incidents.
routine D-Class operations
scheduled research and maintenance
🚨
Minor Incident
$9.6M/yr
Localized unauthorized use or single-point detection requiring a small MTF recovery, cleanup and medical response.
single unauthorized user detected
one MTF recovery operation
local forensic cleanup and medical treatment
🚨
Major Breach
$13.7M/yr
Multiple simultaneous unauthorized uses or a high-profile recovery with extensive medical crises and significant legal exposure.
multiple concurrent users
large-scale medical/surgical cases
major public exposure requiring legal/PR response
🚨
Catastrophic Breach
$29.0M/yr
Widespread distribution or mass-public use with government-level exposure requiring emergency scaling of operations and research.
mass distribution
national/international exposure
emergency scaling of incineration, medical, legal and research
Personnel
22 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#9] Armed/cleared site security for vault and D-Class housing across shifts (3-shift coverage). |
| Research Scientist | 6 | [#16, #17] Medicinal chemistry/analytical staff for mechanism work, trials and R&D. |
| Medical Officer | 2 | [#14, #15] Surgeons/medical staff for extractions, surgeries and long-term care coordination. |
| Technician / Lab Technician | 2 | [#2, #18] Lab techs for glovebox handling, sample prep, incinerator operation and consumables management. |
Confidence Notes
Mid confidence: many capital and routine costs are well-defined (vaults, incinerator, D-Class network) but a large portion of recurring spend is incident-driven and highly variable; estimates use mid-range assumptions for D-Class network size (40) and contingency reserves.