Expected annual
$7.4M
One-time setup
$31.7M
Annual recurring
$6.6M
Personnel
23
Baseline one-time capital (non-quantum) is moderate-to-high driven by compute cluster, integration and facility hardening; recurring annual costs are driven by personnel, contingency reserve, and ongoing tooling/telemetry. Optional quantum/cryogenic scale-up would add tens of millions one-time and substantially increase annual operations.
One-Time Capital Costs
Total: $31.7M
Annual Recurring Costs
Total: $6.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.6M/yr
Normal operational year with no major incidents; covers staff, tooling, maintenance, reserves and routine operations.
no_incidents
steady_operations
regular_maintenance
🚨
Minor Incident
$7.1M/yr
Localized digital/virtual incident requiring elevated forensics, overtime, partial hardware replacement and recovery procedures.
software_exploit
localized_data_loss
short_downtime_recovery
🚨
Major Breach
$9.1M/yr
Significant containment breach or system-wide failure necessitating large-scale incident response, extended investigations, medical/psych treatment and partial rebuild.
widespread_containment_failure
extended_outage
public_exposure_risk
🚨
Research Breakthrough Requiring Scale Up
$35.3M/yr
Decision to acquire and integrate quantum/cryogenic hardware to reach required subatomic fidelity, triggering large one-time capital spend plus increased operations.
research_need_for_non-classical_hardware
funding_approval_for_scaleup
Personnel
23 total
| Role | Count | Notes |
|---|---|---|
| Sysadmin / DevOps | 3 | [#9] 24/7 on-call rotation, high-clearance system administrators and devops engineers (blended fully-burdened cost ~480,000/yr total). |
| Security Officer / MTF Agent (SOC Analysts) | 4 | [#10] Digital SOC analysts for continuous log analysis and IDS/IPS monitoring (blended fully-burdened cost ~485,000/yr total). |
| Physical Security / Guards | 8 | [#11] On-site rotating guard force, biometric access control escorts (blended fully-burdened cost ~535,000/yr total). |
| Research Scientist | 5 | [#14] Lead scientists and junior researchers (approx. 2 seniors + 3 juniors; blended fully-burdened cost aggregated into staff wages ~700,000/yr). |
| Software Engineer | 3 | [#15] Ongoing sandbox codebase maintenance, hardening and tooling engineers (blended fully-burdened cost ~360,000/yr). |
Confidence Notes
Analyst notes provided detailed line items and plausible ranges, enabling midpoint estimates; uncertainty remains around optional quantum hardware, shared-infrastructure amortization, and frequency/severity of anomalous breaches, so confidence is medium.