SCP-4536
Unknown
~
medium confidence
SCP-4536
Expected annual
$13.1M
One-time setup
$62.8M
Annual recurring
$12.5M
Personnel
50
Estimated one-time capital costs are dominated by optional site purchase and major retrofit/contingency funding (~$62.8M). Recurring costs are driven by personnel (security, research, analysts), site lease/maintenance and contingency/reserve funding (~$12.52M/yr).
One-Time Capital Costs
Total: $62.8M
Annual Recurring Costs
Total: $12.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$12.5M/yr
Normal year under a lease/operational posture with routine monitoring and reserves funded.
normal operations
no major weather-induced damage
routine seizures and research
🚨
Minor Incident
$13.5M/yr
Localized heavy precipitation or a cluster of higher-than-normal anomalous sales requiring expanded seizures, repairs and larger amnestic operations.
localized heavy rainfall
increased anomalous sales requiring extra seizures
🚨
Major Weather Event
$27.5M/yr
Sustained or long-range weather effects causing regional damage, mass public exposure, large amnestic campaigns and emergency procurement/relocation.
regional weather control
widespread infrastructure damage
mass exposure requiring public operations
Personnel
50 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 15 | [#1] Full-time armed guards responsible for on-site exclusion, patrols and seizures (12–18 guard range; midpoint used). |
| Security Supervisor | 3 | [#1] Supervisory cadre for security shifts and incident command. |
| CCTV Operator / Surveillance | 4 | [#1] CCTV operators and monitoring staff for continuous video surveillance of exclusion zones. |
| Research Scientist | 6 | [#11] Ballistics, toxicology, aquatic testing and equipment research staff. |
| Meteorologist / Atmospheric Technician | 2 | [#5] Atmospheric monitoring and modelling personnel to track SCP-related precipitation. |
| Cyber Analyst / Urchin Operator | 2 | [#6] Webcrawler maintenance and human analyst time to monitor e-commerce listings. |
| Field Agent / MTF Operative | 3 | [#7] Field seizure team members who perform undercover purchases and seizures. |
| Storage / Logistics Staff | 3 | [#10] Staff for Storage Site-64 incremental capacity, cataloging and inventory control. |
| Medical Officer | 2 | [#13] On-call medics/ER liaisons for site incidents and emergency response. |
| Anthropologist / Cultural Specialist | 3 | [#12] Cultural liaison and memetics specialists for Opochtli research and cover strategy. |
| Engineer / Maintenance | 4 | [#19] Facilities engineers and maintenance staff for HVAC, elevators, generators and building upkeep. |
| Administrative Staff | 3 | [#23] HR, procurement and site administrative personnel covered under administrative overhead. |
Confidence Notes
Estimates are built from analyst line-item ranges; many line items are ranges and contingent options (purchase vs lease, contingency policy) so totals depend on policy choices. Technical costs (generators, sensors) are better constrained than long-range contingency budgets and liability reserves.