SCP-4652
Safe
~
medium confidence
SCP-4652
Expected annual
$2.3M
One-time setup
$8.7M
Annual recurring
$2.2M
Personnel
15
Initial one-time capital and contingency (facility construction, catastrophic reserve, and suppression systems) drive up-front costs into the multi‑million range; recurring costs are dominated by staff wages, medical readiness, research, and security/monitoring (~$2.2M/yr).
One-Time Capital Costs
Total: $8.7M
Annual Recurring Costs
Total: $2.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.2M/yr
Normal operational year with contained testing cadence and regular maintenance; no major incidents.
routine_testing
scheduled_maintenance
regular_research
🚨
Minor Incident
$2.4M/yr
Localized misfire or testing accident causing limited equipment damage, medical treatment, and short downtime.
test_misfire
limited_structural_damage
staff_injury
🚨
Major Breach
$4.7M/yr
Significant containment breach or misfire that damages the test chamber/adjacent facility and requires major repairs and extended operations disruption.
facility_breach
major_equipment_loss
multiple_casualties
🚨
Political Exposure
$2.7M/yr
Theft or public use of an instance (as in the addendum) causing local media/police attention, investigations, and increased legal/PR costs.
unauthorized_leak
public_incident
criminal_use
🚨
Catastrophic Breach
$14.2M/yr
Extensive destructive event (high-power plasma discharge) destroying major facility infrastructure and causing casualties.
major_misfire
structural_collapse
mass_casualties
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Level-4) | 2 | [#10] Two senior/Level-4 personnel required for approvals and research oversight (salaries pro-rated into staff_wages). |
| Security Officer / MTF Agent | 4 | [#10] Dedicated guards allocated to guard locker and test area (pro-rated staffing allocation). |
| Surveillance Operator | 1 | [#2] 1 FTE monitoring CCTV and tamper alarms (separate recurring monitoring cost). |
| Medical Officer | 2 | [#9] On-call trauma/burn capability and medevac readiness (staffing/contract costs in medical_readiness). |
| Engineer / Maintenance | 1 | [#5, #4] Maintenance and systems engineering support for chamber, suppression, and HVAC systems. |
| Administrative Staff | 1 | [#24] Site administrative and overhead allocation (pro-rated). |
| MTF / Trained Operator (specialized pool) | 4 | [#11] Specialized operator pool (high alcohol tolerance/training) retained for testing; counts reflect pool size used to compute retainer/hazard pay. |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing a reasoned budget; however wide ranges on facility/spec choices, catastrophic risk sizing, and contingency assumptions leave material uncertainty.