SCP-4654
Unknown
~
medium confidence
SCP-4654
Expected annual
$5.0M
One-time setup
$8.3M
Annual recurring
$4.9M
Personnel
18
[#31] Initial capital/setup estimated at $8,268,000 with dominant drivers being vault/HVAC construction, specialized instrumentation and contingency reserves; ongoing annual operations are approximately $4,925,000 driven by security staffing, MTF readiness contracts, and cover/OPSEC.
One-Time Capital Costs
Total: $8.3M
Annual Recurring Costs
Total: $4.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.9M/yr
Typical operational year with no containment breach or major incidents; normal maintenance, staffing, and monitoring costs.
routine_operations
no_breach
standard_maintenance
🚨
Minor Incident
$5.2M/yr
Localized vapor release or single-person exposure requiring targeted decontamination, medical treatment, limited remediation and investigation.
localized_vapor_release
single_person_exposure
targeted_decontamination
🚨
Major Breach
$9.9M/yr
Significant release or multiple exposures resulting in large-scale decontamination, facility remediation/partial demolition, mass medical response, legal/OPSEC response and public containment.
mass_release
site_contamination
media_exposure
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#9] Six guards (two per shift) plus one supervisor as described in staffing model. |
| Hazmat / Containment Technician | 5 | [#10] Specialized technicians (3–6 in notes); mid-range staffing chosen to support glovebox/robotics, decon, and emergency response. |
| Research Scientist / Containment Supervisor | 2 | [#11] Senior containment scientists/supervisors (1–3 in notes); mid-range selected to provide oversight and access approvals. |
| Forensic Analyst | 1 | [#17] Dedicated trained analyst for trace-analysis and chain-of-custody workflows. |
| Medical Officer / Nursing Staff | 3 | [#12] On-call physician(s) and critical-care nurse(s) to maintain ICU-level readiness and emergency response. |
Confidence Notes
Analyst notes provide detailed line-item ranges and operational history (including Area-4 loss), enabling a bounded estimate, but many items are order-of-magnitude ranges and final costs depend on Site-81 existing capabilities and chosen operational posture; therefore medium confidence.