SCP-4699
Safe
~
medium confidence
SCP-4699
Expected annual
$1.4M
One-time setup
$2.1M
Annual recurring
$1.4M
Personnel
7
Initial one-time containment, equipment and research setup costs are modest-to-large (~$2.05M one-time driven by contingency/decommissioning funds and research buildout); steady-state recurring costs are ~ $1.37M/yr driven by research staff wages, administrative overhead, consumables and legal/cover operations.
One-Time Capital Costs
Total: $2.1M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year with passive containment, regular monitoring, scheduled research tempo, and no major incidents.
no incident
scheduled experiments
routine maintenance
🚨
Minor Incident
$1.5M/yr
Limited equipment loss or sensor failure, small-scale personnel incident or localized containment scare requiring replacement equipment, investigations and extra legal/PR work.
sensor or tether loss
small accidental viewing/rumor
limited equipment destruction
🚨
Major Breach
$3.2M/yr
Significant escalation requiring use of contingency funds/decommissioning, large-scale recovery/relocation, heavy legal/PR and MTF involvement.
catastrophic experimental failure
forced decommissioning
public exposure / large-scale personnel loss
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Senior Researcher | 1 | [#6] Principal investigator listed in article (Senior Researcher Rafael Rodrigo). |
| Research Scientist | 1 | [#6] Named Researcher (Sarah Jones) assigned to project. |
| Junior Researchers | 2 | [#6] Two named junior researchers (Olivia Holloway, Husayn Tabrizi). |
| Security Officer / MTF Agent | 2 | [#5] Two Level-2 guards covering locker on rotating shifts (proportionate security staffing). |
| Engineer / Maintenance (on-call rapid response) | 1 | [#13] Small on-call rapid-response engineering/containment capability incorporated into staffing estimates. |
Confidence Notes
Estimates are medium confidence: many line items are well-scoped (salaries, standard equipment, legal overhead) but several large ranges and contingent costs (R&D loss rates, decommissioning, contingency fund utilization) introduce substantial uncertainty.