SCP-4704 Neutralized ~ medium confidence
SCP-4704
Expected annual
$3.8M
One-time setup
$7.3M
Annual recurring
$3.7M
Personnel
22
Estimated one-time setup costs are roughly $7.3M driven primarily by acquisition payments, facility retrofit/build and heavy-lift logistics; annual recurring costs are ~ $3.68M driven mainly by staff wages, security, and facilities/energy.
🏗️ One-Time Capital Costs Total: $7.3M
Acquisition Payments $1.8M
[#2] Purchase/acquisition payments, indemnities or expropriation costs to secure dispersed items from private owners/museums.
Archival Storage Reserve $1.2M
[#22] Long-term archival & storage expansion contingency / reserve fund for decades-long custody obligations.
Crating And Transport Prep $600K
[#6] Specialized transport, custom crating, vibration isolation and insurance-grade packing for large and small spheres.
Archaeological Fieldwork Initial $600K
[#13] Initial multi-site archaeological survey/excavation program and in-situ conservation to contextualize finds.
Cataloging And Digital Archive Setup $455K
[#11] High-resolution photography/3D scans for 300 items and initial database development/cataloging labor.
Field Recovery $418K
[#1] Field recovery / salvage operations (crane/rigging/truck/permits and local hires) for large and small items — aggregated estimate.
Initial Research And Lab Setup $400K
[#5, #12] Conservation lab buildout, microscopes/benches and initial scientific testing/consumables for early program.
Heavy Equipment Purchase $400K
[#7] Purchase of minimal heavy equipment fleet (forklifts/crane/flatbeds) as capital option.
Replica And Pr Initial $350K
[#15, #19] Initial replica fabrication for high-visibility pieces and initial PR/cover-story expenses and exhibit swaps.
Facilities $300K
[#3] Retrofit/build-to-suit or retrofit & crane installation for secure storage (reinforced floors, gantry/crane installation).
Legal Diplomatic Initial $288K
[#14] Legal/diplomatic retainers, negotiation budgets and initial repatriation negotiation costs.
Equipment $225K
[#4, #9] One-time HVAC equipment and electronic security/CCTV/environmental sensor installation.
Disposal And Salvage $125K
[#20] Disposal/remediation of destroyed fragments and associated archaeological salvage/lab work.
Replica Database And Legal Initial $88K
[#21] Legal safeguards, NDAs, copyrights and documentation to protect replica designs and cover narratives (initial).
🔄 Annual Recurring Costs Total: $3.7M/yr
Staff Wages $1.0M/yr
[#16] Core program staff (project manager, curator, conservators, archaeologists, logistician, registrar, DB admin) loaded salaries.
Security Personnel $600K/yr
[#8] 24/7 guarded storage staffing (12 guards, overtime, transport security teams) and related benefits.
Research And Monitoring $500K/yr
[#12, #17] Ongoing scientific studies (dating, petrography, isotopic analyses) and provenance tracking / monitoring program.
Facilities Maintenance $450K/yr
[#3, #4, #7] Ongoing lease (warehouse footprint), facility maintenance, HVAC energy/maintenance and heavy-equipment upkeep.
Insurance And Risk Transfer $200K/yr
[#10] Annual premiums for theft/damage/art transport insurance and liability coverage based on declared values.
Incident Response Fund $200K/yr
[#18] Annual contingency for emergency stabilization, re-lifts, urgent conservation triage and PR/legal response.
Cover Story And Legal $180K/yr
[#14, #15, #21, #19] Ongoing legal/diplomatic retainers, PR, replica program maintenance and legal upkeep for cover narratives.
Archaeological Fieldwork Recurring $150K/yr
[#13] Periodic field seasons, small surveys and follow-up excavations.
Supplies And Consumables $100K/yr
[#5] Ongoing conservation consumables, packaging materials and per-artifact treatment supplies.
Logistics And Transport $100K/yr
[#6, #7] Recurring transport costs, ad-hoc heavy-lift rentals if needed, and transport insurance/operations.
Public Education And Replica Program $75K/yr
[#19, #15] Ongoing replica manufacturing and public educational outreach to reduce suspicion and support community relations.
Archival Storage Maintenance $50K/yr
[#22] Annual contributions for long-term storage expansion contingency and major conservation cycles.
Electronic Security Monitoring $30K/yr
[#9] Remote monitoring, alarm service contracts and maintenance for CCTV/environmental sensors.
Replica Legal Maintenance $30K/yr
[#21] Ongoing legal maintenance for replica copyrights, NDAs and suppression measures.
Digital Archive Maintenance $15K/yr
[#11] Server, backup and database hosting/maintenance costs for digital archive and 3D assets.
Cost Scenarios
📊 Baseline (baseline) $3.7M/yr
85.0% probability / year
Normal year with standard operations, no major incidents.
routine recovery scheduled research standard facility operations
🚨 Minor Incident $3.9M/yr
10.0% probability / year +$250K vs baseline
Minor damage during recovery/transport requiring emergency stabilization and extra conservation.
damage during lift transport accident urgent conservation triage
🚨 Political Exposure $5.2M/yr
3.0% probability / year +$1.5M vs baseline
Diplomatic dispute or public outcry forcing repatriation payments, extended negotiations and major PR/legal response.
government demands repatriation claim major negative media attention
🚨 Research Scale Up $7.7M/yr
2.0% probability / year +$4.0M vs baseline
Decision or requirement to scale program rapidly (large acquisitions, build dedicated facility) in a single year.
capex approval mass acquisition campaign building dedicated consolidation facility
👥 Personnel 22 total
Role Count Notes
Project Manager / Curator 1 [#16] Oversees program, liaison with stakeholders.
Research Scientist 2 [#16, #12] Scientific analyses, sample management and publication.
Conservator / Lab Technician 2 [#5] Conservation treatments and lab work.
Archaeologist / Field Technician 1 [#13] Fieldwork leadership and excavation teams.
Logistician / Registrar 1 [#6, #16] Shipping, chain-of-custody and artifact tracking.
Database Administrator 1 [#11] Cataloging, digital archive and 3D asset management.
Monitoring Investigator / Outreach 2 [#17] Provenance tracking, museum/outreach monitoring and rapid-response to new sightings.
Security Officer 12 [#8] Onsite guards (3 shifts × 4) and transport security teams.
📋 Confidence Notes
Estimates are derived from detailed analyst notes and realistic museum/archaeological cost ranges but many inputs are wide ranges (acquisition valuations, number of recoveries, build vs. lease choices), so uncertainty remains.
← SCP-4703 ↑ All SCPs SCP-4705 →