SCP-4712
Neutralized
~
medium confidence
SCP-4712
Expected annual
$3.7M
One-time setup
$8.3M
Annual recurring
$3.7M
Personnel
18
Initial setup and retrofitting are the largest one-time costs (~$8.29M), driven by property acquisition, structural reinforcement and Site-91 containment; recurring yearly operations run approximately $3.69M, driven by on-site staffing, MTF readiness, and ongoing research/monitoring.
One-Time Capital Costs
Total: $8.3M
Annual Recurring Costs
Total: $3.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.7M/yr
Normal operational year with no major breach or large-scale Event-Alpha program escalation; routine maintenance, staffing, research, and monitoring costs only.
no breaches
routine research activity
no major public exposures
🚨
Minor Incident
$3.8M/yr
Small containment incident or single MTF deployment (limited breach or external discovery) requiring targeted response, repairs, limited amnesticization and public witness handling.
single MTF deployment
localized breach or discovery
limited amnesticization
🚨
Major Breach
$4.9M/yr
Significant vault breach requiring multiple MTF deployments, use of contingency neutralization assets, large repairs, and extended medical/amnestic response.
vault breach
multi-day MTF operations
deployment of contingency neutralization
🚨
Catastrophic Breach
$8.7M/yr
Large-scale uncontrolled breach with mass anomaly flow requiring large mobilization, public containment/amnestic campaigns, use of contingency reserve and possible political fallout mitigation.
full vault failure
mass anomalous egress
public exposure requiring large amnestic campaigns
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | [#7, #17] 12 on-site guards for 24/7 coverage plus ~2 additional Site-91 security/MTF liaisons (salaries included in staff_wages estimate). |
| Research Scientist | 4 | [#17, #18] Site-91 research/containment staff involved in SCP-4712 and SCP-4712-A research; staffing costs folded into Site-91 recurring containment estimate. |
Confidence Notes
Estimates are order-of-magnitude and location-sensitive (East London / Site-91 in UK/Yorkshire); many line items are conditional (Event-Alpha program, contingency neutralization) and per-deployment MTF costs are variable, so uncertainty remains moderate.