SCP-472
Safe
~
medium confidence
SCP-472
Expected annual
$1.0M
One-time setup
$2.1M
Annual recurring
$1.0M
Personnel
14
Initial one-time setup is dominated by reinforced containment, lab upgrades, and contingency reserves (~$2.1M). Recurring annual costs are driven primarily by staff wages (security, medical, and research) and ongoing maintenance/operations (~$1.007M/yr).
One-Time Capital Costs
Total: $2.1M
Annual Recurring Costs
Total: $1.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.0M/yr
Normal year with routine operations and no major incidents.
routine_research
scheduled_D-class_exposures
normal_maintenance
🚨
Minor Incident
$1.1M/yr
Single prolonged exposure or small containment lapse requiring extra medical treatment and investigation.
prolonged_exposure
failed_PPE
small_medical_evacuations
🚨
Major Breach
$2.5M/yr
Significant multistaff exposure or multiple Stage 5/6 events requiring emergency response, hospitalizations, legal/PR costs and partial relocation/upgrade.
mass_exposure
multiple_fatalities
legal_actions
🚨
Escalation Upgrade
$1.8M/yr
Containment upgrade required due to worsening anomalous behavior (site move/BLS/major buildout).
area_of_influence_growth
new_biomass_findings
regulatory_containment_upgrade
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#6] 6–12 guards estimated; chosen staffing of 8 to provide 24/7 coverage and direct monitoring during exposures. |
| Research Scientist | 2 | [#18] Small team (1–3 FTE); chosen 2 FTE research staff to run experiments and analyze data. |
| Medical Officer | 1 | [#7] On-call paramedic/nurse practitioner equivalent coverage for exposures and emergency response. |
| Psychologist | 1 | [#11] Psychological evaluations and follow-ups for staff and D-Class; 1 FTE or equivalent contract support. |
| Engineer / Maintenance | 1 | [#15, #16, #23] Facilities and containment systems maintenance, UPS/HVAC support and periodic testing. |
| Administrative Staff | 1 | [#24] Admin support for scheduling, compliance documentation and site approvals. |
Confidence Notes
Line-item cost ranges were provided for most categories, allowing mid-range estimates; uncertainty remains around reserved contingency choices and breach probabilities/scale, so confidence is medium.