SCP-4743
Euclid
~
medium confidence
SCP-4743
Expected annual
$1.2M
One-time setup
$1.2M
Annual recurring
$1.2M
Personnel
12
Initial setup costs are moderate-heavy (~$1.20M) driven by hangar modifications, contingency/insurance reserves, and research/hardware setup; annual operating costs are dominated by staff wages, ongoing research/IT/storage, and contingency/administrative reserves (~$1.20M/year).
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Routine year with no major incidents; normal operations, scheduled research and maintenance only.
no breaches
routine research activity
standard staffing levels
🚨
Minor Incident
$1.3M/yr
Small containment breach or equipment failure requiring repairs, temporary containment in additional containers and PR response.
small structural breach
localized equipment failure
short-term public exposure scare
🚨
Major Breach
$1.7M/yr
Significant containment failure requiring large-scale recapture, property damage repairs, extended public mitigation and substantial contingency drawdown.
large structural failure
extended public exposure
mass relocation/recapture effort
🚨
Research Breakthrough Requiring Scale Up
$1.4M/yr
Successful research outcome prompting expanded experiments, hiring/contracting, and additional equipment procurement for scale-up.
promising experimental results
need for larger-scale testing
temporary staffing/hardware purchases
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#8] Two per shift in a 3-shift model for continuous onsite security and monitoring. |
| Containment Technician | 3 | [#8] Technicians for day-to-day containment, maintenance, and on-call response with overlap coverage. |
| HMCL Supervisor | 1 | [#9] Program manager responsible for containment oversight and recreational access approvals. |
| Behavioral Scientist | 1 | [#9] 0.5–1.0 FTE typical; listed as 1 position here (may be pro-rated) for behavioral experiments and data analysis. |
| Research Technician | 1 | [#9] Laboratory and experiment support for acoustic/motion-capture and electrostatic studies. |
| Administrative Staff | 0 | [#19, #24] Administrative overhead for scheduling, procurement and cover-story maintenance is budgeted but may be shared across site staff; no dedicated full-time hire assumed (costs included in misc_admin_overhead). |
Confidence Notes
Many line items are given as wide ranges (e.g., reserve sizing, staff pay bands, research scope). Core infrastructure and staffing estimates are well-specified but contingency and insurance choices create variability; moderate confidence is appropriate.