SCP-4763
Unknown
~
medium confidence
SCP-4763
Expected annual
$794K
One-time setup
$1.2M
Annual recurring
$783K
Personnel
8
Estimated one-time establishment costs are significant (~$1.14M) driven by land/control, containment works, lab setup and contingency reserves; recurring annual costs are driven by staff wages, research/monitoring, emergency readiness and replenishment (~$783k/yr).
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $783K/yr
Cost Scenarios
📊
Baseline
(baseline)
$783K/yr
Normal year with ongoing containment, monitoring, research and no major incidents.
routine_monitoring
scheduled_maintenance
ongoing_research
🚨
Minor Incident
$808K/yr
Single-person ingestion or small localized exposure requiring emergency response, amnestic use and targeted remediation.
single_ingestion_incident
localized_response
amnestics_and_medical_use
🚨
Major Contamination
$2.8M/yr
Significant migration of anomalous fluid into groundwater or soil requiring large-scale remediation, public protection measures and legal/PR containment.
aquifer_contamination
municipal_water_impact
large_scale_remediation
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Metaphysician | 1 | [#17] Senior metaphysician responsible for anomaly characterization and protocol design. |
| Research Scientist | 1 | [#16, #17] Laboratory scientist for chemical/metaphysical assays and experimental work. |
| Hazmat Technician | 2 | [#17, #18] Trained hazardous-materials technicians for site work, sampling and decontamination. |
| Security Officer / Coordinator | 1 | [#17, #3] Security coordinator for perimeter security, access control and liaison with local authorities. |
| Drone Operator / Technician | 1 | [#11, #8] Operator/tech for drone and robotic inspection, maintenance and remote sampling operations. |
| Medical Officer | 1 | [#19, #20] On-call medical/psych clinician for exposure treatment and amnestic procedures. |
| Administrative Staff | 1 | [#21, #25] Administrative/legal liaison supporting cover-story management, permits and documentation. |
Confidence Notes
Line-item ranges and containment approach are well-documented, so capital/operational items are estimable; large uncertainty remains around propagation risk, remediation scale and per-incident costs (aquifer impacts can raise costs by orders of magnitude), so confidence is medium.