SCP-4795
Unknown
~
medium confidence
SCP-4795
Expected annual
$1.8M
One-time setup
$3.0M
Annual recurring
$1.7M
Personnel
16
Initial one-time setup is approximately $2.96M driven primarily by a biomechanical drone fleet, R&D and lab/aviary buildout; recurring annual costs are about $1.71M driven by staff wages, drone maintenance/reserves, research and legal/cover obligations.
One-Time Capital Costs
Total: $3.0M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal operational year with routine monitoring, maintenance and research activity but no large incidents.
no major drone losses
routine research schedule
steady municipal cooperation
🚨
Minor Incident
$2.1M/yr
Localized drone losses, moderate sabotage or a concentrated mass-flock encounter requiring accelerated replacements and extra ops.
drone attrition > normal
small-scale sabotage
localized mass-flock engagements
🚨
Major Breach
$2.5M/yr
Large mass flock event or containment failure requiring emergency mass-response, medical claims, large equipment replacement and PR/legal payouts.
mass convergence of tens of thousands of pigeons
major public injuries/coverage
large-scale drone fleet losses
🚨
Political Exposure
$1.9M/yr
Public or municipal discovery forcing heavy legal, PR and cover-up expenditures and increased liaison/compensation costs.
media exposure
municipal investigation
legal suits
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Parazoologist | 3 | [#7] Senior parazoologists and supporting research staff included in staff wage total. |
| Technical Staff / Drone Operator | 6 | [#8] Local technicians handling daily drone operations, packing and data-tagging. |
| Security Officer / MTF Agent | 7 | [#9] On-site security and rapid-response guards (mix of contracted and covert operatives). |
Confidence Notes
Analyst notes provide detailed line-item ranges, but several large uncertainties remain (fleet size, degree of bespoke R&D, secrecy premium, and frequency/severity of incidents). Estimates use mid-range assumptions and Foundation planning guidance; variance could be substantial.