SCP-4834
Euclid
~
medium confidence
SCP-4834
Expected annual
$7.8M
One-time setup
$159.3M
Annual recurring
$7.7M
Personnel
54
Initial one-time capital, equipment and contingency reserves dominate costs ( ~$159.3M one-time ), while steady-state operations require substantial staffing and specialized support (~$7.705M/yr). Primary drivers: temporal sink hardware & spares, portable response kits, continuous 24/7 security/watcher staffing, and large contingency reserves for timeline repair.
One-Time Capital Costs
Total: $159.3M
Annual Recurring Costs
Total: $7.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.7M/yr
Standard uneventful year with continuous containment, routine maintenance and regular operations only.
no breach
regular maintenance
routine deployments only
🚨
Minor Incident
$8.0M/yr
Localized disturbance or single relocation event requiring rapid response and limited records restoration.
single teleport disturbance
limited timeline overwrite
localized records reconstruction
🚨
Major Breach
$11.7M/yr
Containment failure causing sink damage or prolonged uncontrolled teleportation, requiring sink replacement, large recontainment ops and significant restoration.
sink damage
multi-site recontainment
widespread timeline corruption
🚨
Catastrophic Breach
$57.7M/yr
Persistent timeline divergence or TM-Class Restoration event requiring large-scale restoration and tapping contingency reserves.
TM-Class Restoration Event
widespread persistent timeline corruption
mass amnestic & infrastructure reconstruction
Personnel
54 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#6] 24/7 armed guards assigned to containment location (12 personnel as specified). |
| Security Officer / Watcher Teams | 30 | [#7] Continuous watchers across SCP-4834-1 through -5 (approx. 30 agents total as specified). |
| Temporal Intervention Team / Specialist Operators | 12 | [#11] Dedicated Temporal Intervention Team (12 FTEs) on-call 24/7 for breaches and recontainment. |
Confidence Notes
Analyst notes provide detailed line-item estimates for hardware, staffing and recurring costs, enabling a structured budget, but uncertainties remain around incident frequencies, per-transfer counts, and the scale/timing of contingency deployments which reduces confidence to medium.