SCP-4867
Safe
~
medium confidence
SCP-4867
Expected annual
$3.9M
One-time setup
$1.8M
Annual recurring
$3.8M
Personnel
24
Initial capital outlays for lab upgrades, vehicles, and specialized survey equipment total roughly $1.8M one-time; ongoing annual operations (staff wages, travel, remote sensing, maintenance, insurance and contingency) run about $3.82M/yr, driven primarily by personnel costs and contingency reserves.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $3.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.8M/yr
Normal operational year with no major incidents; routine searching, sample processing, and containment prep.
routine_field_campaigns
standard_sample_processing
no major discoveries or public exposure
🚨
Minor Incident
$4.0M/yr
Localized incident (e.g. sample contamination, small field accident, increased testing needs) requiring extra analyses, travel and temporary overtime.
surge in sample volume
minor field accident
specialist subcontracting
🚨
Discovery And Containment
$5.3M/yr
SCP-4867 is located and requires secure transport and construction of enhanced containment and expanded specialist response.
object located
specialized containment required
armored/refrigerated transport and rapid buildout
🚨
Political Exposure
$4.3M/yr
Public or interagency exposure requiring major legal/PR response, expanded security, and possible relocation of site assets.
media leak
local authority interference
legal challenge
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / PI | 6 | [#1] Principal investigators and full-time research scientists responsible for planning, analysis, and oversight. |
| Field Technician / Agent | 6 | [#2] Mobile search teams and field operators conducting reconnaissance and sampling. |
| Security Officer / MTF Agent | 9 | [#3] Armed/unarmed guards for site and field mission coverage, shift rotation accounted for. |
| Administrative Staff | 3 | [#4] Finance, logistics, HR, permitting, and scheduling support. |
Confidence Notes
Line-item ranges were provided for most costs, enabling mid-range estimates, but significant uncertainty remains around discovery probability, containment scale-up, and contingency sizing, so confidence is moderate.