SCP-4871
Unknown
~
medium confidence
SCP-4871
Expected annual
$2.0M
One-time setup
$2.5M
Annual recurring
$2.0M
Personnel
17.25
One-time setup costs are approximately $2,470,000 driven by reinforced cell construction, contingency seed and equipment; ongoing annual operations are approximately $1,990,000/yr driven by security and research staff, specialized response readiness, and recurring testing/maintenance.
One-Time Capital Costs
Total: $2.5M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal uneventful year with scheduled research, maintenance, and no major incidents.
routine research
scheduled maintenance
no breaches
🚨
Minor Incident
$2.1M/yr
Localized interaction or small containment-related damage requiring repairs, overtime, and moderate external testing.
unauthorised movement
minor mechanical damage
small repair and overtime
🚨
Major Breach
$2.8M/yr
Significant containment breach causing equipment destruction, public exposure risk, and major repairs plus legal/cover operations.
violent breach
major structural damage
large-scale repairs and replacement
🚨
Political Exposure
$2.2M/yr
Publicized appearance or visibility event requiring large-scale OPSEC, media cover, and legal mitigation (e.g., convention incident).
public sighting
need for cover operations
media/legal mitigation
Personnel
17.25 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#15] Dedicated 24/7 guard contingent: 4guards/shift × 3 shifts = 12 guards (loaded cost included in staff_wages). |
| Research Scientist / Engineer / Technician | 4.5 | [#19] Research and technical team (3–6 FTEs). Headcount expressed as FTE (~4.5) consistent with aggregate loaded research wages. |
| Psychologist / Personnel Support | 0.75 | [#17] Dedicated psychologist (0.5–1.0 FTE) and counseling support; salary portion included in staff_wages, counseling budget in recurring costs. |
Confidence Notes
Analyst notes provide detailed line-item ranges allowing midpoint estimates, but several large optional choices (industrial CT purchase, contingency sizing, R&D paths) and unknowns about SCP behaviour introduce material uncertainty.