SCP-4889
Euclid
~
medium confidence
SCP-4889
Expected annual
$726K
One-time setup
$2.2M
Annual recurring
$711K
Personnel
2
Upfront one-time capital and containment setup is moderate-to-high (~$2.2M driven largely by an optional specialized BSL/relocation contingency). Recurring annual costs are approximately $711k/year driven by field staff wages, research/sequencing, cover/legal, and communications/storage.
One-Time Capital Costs
Total: $2.2M
Annual Recurring Costs
Total: $711K/yr
Cost Scenarios
📊
Baseline
(baseline)
$711K/yr
Normal year with remote monitoring, periodic patrols, routine maintenance, and regular research activity; no major incidents or breaches.
regular snowfall events
scheduled inspections
routine research sampling
🚨
Minor Incident
$756K/yr
Localized incident requiring emergency response, additional sequencing/analysis, biohazard disposal, and overtime for staff (e.g., aggressive event requiring medevac activation and extra lab work).
event requiring medevac/helicopter
extra sequencing and disposals
equipment damage needing repairs
🚨
Major Breach
$1.0M/yr
Significant containment breach or public exposure requiring large emergency operations, legal/PR response, major repairs, and potential relocation planning (but not full construction).
unauthorized civilian discovery/vandalism
SCP-4889-A bypasses barriers or causes public harm
large-scale evidence exposure / FOIA escalation
Personnel
2 total
| Role | Count | Notes |
|---|---|---|
| Field Technician / Containment Specialist | 2 | [#10] Two FTEs estimated for scheduled sample collection, equipment maintenance, and inspections; salaries included in staff_wages. |
| Security Contractor (periodic patrols) | 0 | [#9] Security provided by contracted patrols in the baseline/minimal model; budgeted under staff_wages but not full-time on-site headcount. |
| Veterinary / Pathology (contract) | 0 | [#11] Veterinary/pathology support is contracted (retainer), not full-time on-staff; recurring costs are budgeted under veterinary_and_pathology. |
Confidence Notes
Reasonable detail in analyst notes and a fixed geographic site make cost categories identifiable, but wide ranges for one-time land acquisition, optional specialized facility construction, and posture choices (minimal vs. robust) lower precision; many recurring items depend on event frequency and chosen containment posture.