SCP-4894
Safe
~
medium confidence
SCP-4894
Expected annual
$2.9M
One-time setup
$1.6M
Annual recurring
$2.9M
Personnel
16
One-time capital and site setup costs are roughly $1.61M for a single site (acquisition, stabilization, housing conversion, equipment). Recurring annual operations dominated by staff wages, research/medical monitoring, and contingency reserve, totaling about $2.908M/year.
One-Time Capital Costs
Total: $1.6M
Annual Recurring Costs
Total: $2.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.9M/yr
Normal year with single active site, ongoing research and standard maintenance; no major incidents.
no incidents
routine research
normal maintenance
🚨
Minor Incident
$3.2M/yr
Localized accident or minor breach requiring repair, increased PR/legal costs, and short-term medical care.
minor breach or vandalism
localized tunnel collapse
small-scale legal inquiry
🚨
Major Breach
$4.1M/yr
Serious containment breach, large-scale medical emergency or legal exposure requiring regional ERT mobilization, site reconstruction, and litigation costs.
major cave-in or breach
public exposure/legal action
serious medical complications
🚨
Research Breakthrough Requiring Scale Up
$3.5M/yr
Positive but expensive outcome: research requires scale-up of cohort studies, expanded imaging and staffing.
promising experimental results
need to recruit/monitor many additional subjects
expanded clinical testing
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | [#3] 24/7 on-site security staffing: 3shifts of 3 guards. |
| Research Scientist | 3 | [#12] PI plus postdocs/senior researchers for longitudinal studies. |
| Lab Technician | 2 | [#12, #16] Technicians handling assays, samples, and consumables for testing. |
| Secure Housing Staff (Medical/Care) | 2 | [#14, #13] Medical technologist / caregiver and security assigned to SCP-4894-A custody and observation. |
Confidence Notes
Estimates are derived from the analyst's provided ranges and canonical staffing models; per-site variability and broad estimate ranges produce moderate confidence rather than high.