SCP-5020 Unknown ~ medium confidence
SCP-5020
Expected annual
$4.1M
One-time setup
$4.7M
Annual recurring
$4.0M
Personnel
24
First-year one-time setup and reserves are approximately $4.66M (dominated by a $3.0M scale-up reserve and facility/equipment buildout); baseline recurring annual costs are about $3.98M, driven by MTF availability, research & monitoring, containment R&D and emergency reserves.
🏗️ One-Time Capital Costs Total: $4.7M
Scale Up Reserve $3.0M
[#25] One-time contingency reserve for large-scale remediation or additional facilities.
Facilities $600K
[#2] Construction of unfurnished humanoid containment chambers (2 chambers at ~$300,000 each).
Initial Research And Lab Setup $350K
[#13] Initial research lab setup for entomology/xenobiology and BSL-grade equipment.
Flamethrowers $150K
[#7] Procurement, secure storage, training & certification for Foundation-grade flamethrowers (2–4 units).
Non Invasive Imaging $112K
[#14] High-resolution thermal cameras, long-lens CCTV, acoustic sensors and low-energy scanning hardware.
Storage Lockers $100K
[#1] Retrofit/repellent-lined secure storage lockers (~$5,000 per locker assumed for 20 lockers).
Hvac Filtration $100K
[#3] Dedicated HVAC, HEPA/charcoal filtration and scrubbers installed (one-time capital).
Webcrawler Development $60K
[#15] Development of automated online monitoring/purchasing system (CRT/IO).
Field Containment Kit $55K
[#10] Field containment/recovery kit (portable foggers, sealed crates, small incinerator).
Inventory And Quarantine Setup $55K
[#16] Secure cataloging system, quarantined shelving and climate control setup.
Regulatory Consulting $38K
[#21] One-time regulatory consulting for permits and hazardous materials handling.
Ppe Decon Fitout $20K
[#6] Initial PPE and decontamination station fit-out (showers/airlocks/decon baths).
Cartridge Seed Stock $15K
[#17] Seed stock purchase of cartridges and reproduction/duplication of test ROM cartridges.
Equipment $0
[]
🔄 Annual Recurring Costs Total: $4.0M/yr
Staff Wages $1.8M/yr
[#5, #9, #26] MTF roster salaries and availability (~12-person roster), weekly inspection technician wages, and program management/admin wages.
Research And Monitoring $725K/yr
[#13, #27] Annual research program budget (personnel, assays, sequencing) plus diagnostics/pathology and pathogen containment workflows.
Containment R And D $400K/yr
[#30] Containment R&D to develop alternatives to burning/neutralization and non-destructive methods.
Emergency Response Reserve $300K/yr
[#23] Annual allocation to contingency reserve for repairs, replacement lining, and emergency remediation.
Field Recovery Ops $200K/yr
[#24] Field recovery & intelligence operations budget to locate and intercept external consoles.
Cover Story And Legal $100K/yr
[#19] Baseline legal/PR retainer and cover-story maintenance.
Training And Drills $52K/yr
[#20] Recurring safety training, live drills, certifications and cross-training.
Logistics And Transport $50K/yr
[#22] Secure transport budget for transfers between sites and field.
Medical Surveillance $50K/yr
[#11] Ongoing medical screening, prophylaxis, rapid-response med team and baseline treatment stock.
Public Health Coordination $50K/yr
[#28] Coordination and small-scale public-health response readiness budget.
Webcrawler Purchasing Budget $42K/yr
[#15] Monthly acquisition/purchase budget and maintenance for CRT/IO (~$1k–$5k/mo plus maintenance).
Amnestics And Aftercare $40K/yr
[#18] Class-B amnestic administration, medical observation and aftercare for witnesses (baseline ~20 witnesses/yr example).
Environmental Compliance $35K/yr
[#21] Annual permitting, hazardous materials compliance and consultant fees.
Facilities Maintenance $34K/yr
[#3, #29] HVAC energy/maintenance and replacement/disposal of contaminated HVAC filters.
Inventory Space Overhead $30K/yr
[#16] Space, climate-control and records management overhead for quarantined storage.
Hazardous Disposal Costs $20K/yr
[#12] Incineration/autoclave disposal and transport of neutralized instances (expected annual disposals aggregated).
Flamethrower Fuel And Maintenance $12K/yr
[#7, #8] Fuel, periodic training burns and maintenance for flamethrowers (~$5k–$15k/yr range; mid-estimate used).
Field Kit Consumables $10K/yr
[#10] Consumables for portable foggers, sterilant stocks and small incinerator operation.
Non Invasive Equipment Service $10K/yr
[#14] Annual service/calibration for imaging and monitoring equipment.
Supplies And Consumables $5K/yr
[#4] High-grade insect-repellent supplies (lining replenishment) for chambers/storage.
Ppe Decon Consumables $5K/yr
[#6] Consumable PPE, disinfectants and replacement supplies for decon station.
Cartridge Replacement $3K/yr
[#17] Annual replacements and reproduction of test cartridges/ROMs.
Cost Scenarios
📊 Baseline (baseline) $4.0M/yr
87.5% probability / year
Normal operational year with no major incidents; program maintained, routine research and acquisitions proceed.
no breaches scheduled training and research routine acquisitions
🚨 Minor Incident $4.1M/yr
10.0% probability / year +$150K vs baseline
Isolated containment breach or neutralization event requiring MTF deployment, localized repairs and disposal.
single-chamber breach one neutralization event limited exposures
🚨 Major Breach $5.0M/yr
2.0% probability / year +$1.0M vs baseline
Multi-instance breach or field outbreak requiring extended MTF operations, facility repairs, public PR/legal action and higher medical costs.
multi-instance escape public exposures extended MTF deployment
🚨 Catastrophic Outbreak $12.0M/yr
0.5% probability / year +$8.0M vs baseline
Widespread public health outbreak or large-scale extradimensional expansion requiring emergency national-level response, facility expansion and activation of scale-up reserves.
widespread public outbreak large-scale SCP-5020-A expansion major political exposure
👥 Personnel 24 total
Role Count Notes
Security Officer / MTF Agent 12 [#9] 12-person MTF-Eta-6 availability roster accounted in MTF operating costs.
Research Scientist 4 [#13] Research program (entomologists/xenobiologists) included in research budget.
Research Technician 2 [#13] Lab technicians and assay support included in research budget.
Site Technician / Containment Tech 1 [#5] Weekly inspection and repellent/damage checks (part-time equivalent).
Engineer / Maintenance 1 [#3] HVAC/filtration maintenance and equipment servicing.
Medical Officer 1 [#11] Medical surveillance and rapid-response med team support.
Administrative Staff / Program Manager 3 [#26] Program managers, safety officers, procurement and finance staff.
📋 Confidence Notes
Analyst notes provide detailed line items with ranges allowing mid-point estimates; uncertainty remains in event frequencies, required quantities (lockers, chambers) and outbreak scale, so confidence is medium.
← SCP-5019 ↑ All SCPs SCP-5021 →