SCP-5041
Keter-provisi
~
medium confidence
SCP-5041
Expected annual
$4.2M
One-time setup
$6.7M
Annual recurring
$4.1M
Personnel
10
Initial capital (one-time) for specialized cell construction and contingency capital are the primary up-front costs (~$6.70M). Annual operating costs are dominated by staffing, a long-term replacement allowance, and satellite imagery censorship (~$4.13M/yr).
One-Time Capital Costs
Total: $6.7M
Annual Recurring Costs
Total: $4.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.1M/yr
Normal, uneventful year with standard operations and no major incidents.
routine_operations
no_breach
standard_maintenance
🚨
Minor Incident
$4.3M/yr
Localized containment incident requiring amnestic deployment, limited repairs, overtime, and modest PR/legal response.
localized_breach
amnestic_deployment
minor_property_damage
🚨
Major Breach
$7.6M/yr
Significant containment breach or discovery of new anomalous properties requiring large-scale remediation, capital replacement, and major PR/amnesia campaign.
full_containment_breach
anomalous_property_escalation
public_exposure
🚨
Satellite Deployment
$6.9M/yr
Decision/year in which a dedicated LEO asset or equivalent is deployed/paid for as a one-time solution to imagery censorship.
decision_to_deploy_LEO_asset
escalated_censorship_requirements
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#11] Minimum 24/7 staffing: six guards (two per shift) as full-time equivalents. |
| HMCL Supervisor / Senior Containment Supervisor | 1 | [#12] Senior supervisor responsible for SCP-5041 operations. |
| Research Liaison | 1 | [#12] Part-time research liaison (modeled as 1 headcount for staffing cost allocation). |
| Medical Officer / Psychiatric Tech | 1 | [#12] On-call medical/psychiatric tech for amnestic administration and emergencies. |
| Engineer / Maintenance | 1 | [#12] Maintenance technician for automated systems, HVAC, skylights and generators. |
Confidence Notes
Analyst notes provide detailed line-item ranges; however wide ranges for satellite censorship, long-term forecasts, and contingency responses introduce material uncertainty. Estimates use midpoints and conservative allowances.