SCP-5049
Unknown
~
medium confidence
SCP-5049
Expected annual
$21.5M
One-time setup
$101.3M
Annual recurring
$20.0M
Personnel
25
Total one-time capital is dominated by potential site construction and contingency reserves (~$101.4M); recurring annual costs are driven by facilities operations, staffing, and research/monitoring (~$20.0M/yr). Main drivers: permanent/provisional site costs, ongoing facilities & research, and cover-up/response budgets.
One-Time Capital Costs
Total: $101.3M
Annual Recurring Costs
Total: $20.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$20.0M/yr
Normal year with monitoring, small/localized incidents, and routine operations; no major breaches or mass exposure.
periodic_local_broadcast_interruptions
routine_field_investigations
🚨
Minor Incident
$21.0M/yr
Localized broadcast interruption(s) producing one or a few portals, requiring several MTF deployments, targeted takedowns, amnestic administration, and modest cover-up spend.
localized_broadcast_interruptions
single_portal_creation
small_number_of_civilians_exposed
🚨
Major Breach
$45.0M/yr
Widespread or national-level propagation of SCP-5049-2, multiple simultaneous portals, mass exposures requiring large-scale deployments, emergency provisional site erecting, and large contingency drawdown.
nationwide_broadcast_propagation
multiple_portals
mass_exposure
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Television Analyst / Data Scientist | 9 | [#4] 24/7 monitoring, triage, and feed analysis (6–12 FTEs recommended; midpoint used). |
| Security Officer / MTF Agent | 16 | [#9] MTF Kappa-11 operatives and specialists (demolitions, engineers, medics) sized at ~12–20; midpoint used. |
Confidence Notes
Analyst notes provide detailed line-item ranges allowing mid-range estimates, but uncertainty remains high for frequency of incidents, final TGIF-Device R&D cost, and whether permanent site construction will be required; ranges and contingency reserves reflect that uncertainty.