SCP-510
Keter
~
medium confidence
SCP-510
Expected annual
$7.5M
One-time setup
$24.1M
Annual recurring
$6.9M
Personnel
26
Initial capital/setup costs are dominated by sealed containment suite construction, instrumentation, robotics and contingency reserves (~$24.1M one-time). Ongoing annual costs are driven by staff wages, research/instrument maintenance, consumables, legal/insurance and waste management (~$6.865M/yr), with an expected annual cost (probability-weighted) of ~$7.535M.
One-Time Capital Costs
Total: $24.1M
Annual Recurring Costs
Total: $6.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.9M/yr
Normal year with routine operations, maintenance, research and no major containment incidents.
no incidents
standard research cadence
routine maintenance
🚨
Minor Incident
$7.9M/yr
Localized contamination event or small breach requiring rapid response, extra decontamination, limited treatment and legal/PR engagement.
localized breach
single-subject infestation
small-scale remediation
🚨
Major Breach
$16.9M/yr
Significant containment failure with multi-subject infestation, extended remediation, potential site lockdown and substantial legal exposure.
multi-subject infestation
equipment failure
extended remediation and relocation
🚨
Catastrophic Breach
$56.9M/yr
Severe uncontrolled release or legal/political exposure leading to long-term remediation, relocation, high settlements, and major contingency activation.
site-wide failure
public exposure
mass infestation
Personnel
26 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#12] 24/7 guarded perimeter and access control; headcount used to derive security wages. |
| Specialized Containment Technician / HazMat Technician | 6 | [#13] Technicians for air systems, decontamination, seal inspection and maintenance. |
| Research Scientist | 8 | [#14] Multi-disciplinary research team (virology/microbiology/physics) included in research wages/overhead. |
Confidence Notes
Analyst notes provide detailed line items and ranges for most categories, enabling a mid-range confidence in cost allocation; uncertainty remains due to wide ranges on capital items, contingency reserve sizing, and unpredictable breach frequency/severity for a Keter-class infective object.