SCP-5115
Thaumiel
?
low confidence
SCP-5115
Expected annual
$30.7M
One-time setup
$75.6M
Annual recurring
$30.2M
Personnel
95
One-time capital to stand up containment and HYPOSTAT-2 R&D is ~ $75.6M driven by lab buildout, retrofitting and capital reserves; annual recurring operations run ~ $30.2M driven by staff wages, facility maintenance, security, and consumables.
One-Time Capital Costs
Total: $75.6M
Annual Recurring Costs
Total: $30.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$30.2M/yr
Normal year with routine operations, maintenance, audits and scheduled R&D; no major incidents.
routine operations
scheduled maintenance
no containment or public incidents
🚨
Minor Incident
$31.7M/yr
Localized containment/test chamber malfunction or small-scale breach requiring cleanup and minor repairs.
chamber failure
localized equipment damage
minor exposure requiring remediation
🚨
Major Breach
$40.2M/yr
Significant containment failure or program-level accident requiring major repairs, extended response, legal/cover operations and replacement of major assets.
major containment breach
loss of key equipment
extended operational downtime
🚨
Catastrophic Breach
$80.2M/yr
Systemic metaphysical/containment collapse or wide-scale incident requiring catastrophic response and major reserve drawdown.
systemic containment failure
existential/metaphysical cascade
large-scale cover-up operations
🚨
Research Scaleup
$35.2M/yr
Accelerated program expansion following a research breakthrough that requires rapid capital deployment and scaling of deployment/retrofitting.
successful breakthrough
decision to deploy foundation-wide
programmatic scale-up
Personnel
95 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Engineer | 28 | [#10] Experimental physicists, control/software engineers, and senior researchers forming the core HYPOSTAT-2 team. |
| Security Officer / MTF Agent | 45 | [#11] 24/7 armed/site security and quick reaction force for containment incidents; includes benefits and hazard pay reflected in staff_wages. |
| Technician | 8 | [#7, #9] Skilled technicians for robotics, prototyping, and day-to-day lab support; recurring spares/maintenance budget accounts for their work. |
| Engineer / Maintenance | 6 | [#5, #3] Facilities, power, cryogenics and structural maintenance engineers. |
| Medical Officer | 4 | [#12] On-site medical team for trauma, quarantine, and pathology support. |
| Administrative Staff | 3 | [#14, #10] Administrative, OPSEC, and program management support (includes ops manager duties). |
| Site Director / Executive Staff | 1 | [#10] Program director / executive oversight for HYPOSTAT-2 and SCP-5115 operations. |
Confidence Notes
Costs are based on wide analyst ranges and qualitative/ambiguous anomaly requirements; SCP-5115's metaphysical effects and programmatic scale (Thaumiel application) create high uncertainty in capital/reserve sizing and incident likelihoods.