SCP-5124
Euclid
~
medium confidence
SCP-5124
Expected annual
$9.7M
One-time setup
$33.5M
Annual recurring
$8.6M
Personnel
30
Estimated one-time setup costs are dominated by an emergency incident seed fund and facility/research buildout (~$33.45M one-time); steady-state operations run at roughly $8.576M/year driven by staff wages, continuous compute/storage, legal/PR/takedown retainers, and ongoing reserve replenishment.
One-Time Capital Costs
Total: $33.5M
Annual Recurring Costs
Total: $8.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.6M/yr
Normal year with routine detections, maintenance, occasional seizures, and no large-scale outbreak.
routine_detections
isolated_manual_introductions
🚨
Minor Incident
$9.1M/yr
Isolated but labor-intensive incident (several site seizures, targeted takedowns, legal actions, limited replacements/amnestic treatments).
isolated_manual_introductions
single-site_outbreak
multiple_seizures
🚨
Major Outbreak
$58.6M/yr
Large-scale infection of major cloud backups/CDNs or mass device infection requiring global emergency response and mass remediation/amnesticization.
cdn_or_cloud_scale_infection
mass_device_infection
global_backup_contamination
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#8, #14] Rapid-reaction teams for seizures, field ops, and secure transport; includes 2 teams of ~5. |
| Cybersecurity Analyst / SRE / ML Engineer | 10 | [#1, #2, #3, #9] Core team to run crawler, operate .AIC-5124, SRE support for compute/storage, and incident analysis. |
| Research Scientist | 3 | [#2, #25] Staff for R&D on detection models and long-term neutralization research. |
| Medical Officer | 2 | [#13] Small medical/amnestic team for treatments and aftercare. |
| Engineer / Maintenance | 2 | [#4, #19] Facility engineers for air-gapped lab, power systems, and equipment maintenance. |
| Administrative Staff | 2 | [#10, #12, #16] Admin/coordinators for legal contracts, international coordination, and PR/cover logistics. |
| Site Director / Executive Staff | 1 | [#26] Program-level oversight and executive coordination. |
Confidence Notes
Analyst notes provide detailed line items and plausible ranges but many costs are wide-ranging and incident frequencies are uncertain; contingency sizing (emergency reserve) dominates one-time estimates and increases uncertainty.