SCP-5143
Unnecessary
~
medium confidence
SCP-5143
Expected annual
$3.0M
One-time setup
$15.7M
Annual recurring
$2.9M
Personnel
4
One-time startup and contingency capital (retrofits, equipment purchase, and large removal contingencies) total roughly $15.7M, while baseline recurring operations (staff, maintenance, inspections, logistics, insurance and monitoring) run about $2.87M/year; largest drivers are facilities/equipment capital and recurring maintenance/inspection + payroll.
One-Time Capital Costs
Total: $15.7M
Annual Recurring Costs
Total: $2.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.9M/yr
Normal year with no major incidents: steady rotations, routine maintenance, monitoring, and occasional charters/inspections.
routine_rotations
scheduled_inspections
no_major_incident
🚨
Minor Incident
$3.4M/yr
Localized structural or organic escalation requiring emergency pumping/neutralization, expedited ROV days, short salvage or targeted remediation activities.
localized_flooding/acid_pocket
urgent_ROV_charter_and_salvage
regulatory_remediation_action
🚨
Major Breach
$12.9M/yr
Significant structural failure or decision to remove/isolate platform triggering large-scale salvage, tow/dismantle or in-situ neutralization campaign.
structural_collapse
large_scale_organic_spread
decision_for_full_removal
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Embedded Offshore Engineer / Operative | 4 | [#1] Pool of operatives sized to ensure at least two qualified engineers are on-site continuously (rotations, leave, illness); headcount aligned to payroll estimate. |
Confidence Notes
Notes are detailed with ranges for most items, allowing moderate confidence in order-of-magnitude estimates; significant uncertainty remains around frequency of incidents and the chosen scale of contingency removal campaigns, which dominate one-time costs.