SCP-5173
Keter
?
low confidence
SCP-5173
Expected annual
$203.1M
One-time setup
$12.8B
Annual recurring
$193.5M
Personnel
126
One-time capital costs for space assets, neutralisation R&D and potential directed-energy infrastructure dominate (multi‑billion USD). Annual recurring costs are dominated by insurance, mission operations, monitoring and staffing (~$150M/yr).
One-Time Capital Costs
Total: $12.8B
Annual Recurring Costs
Total: $193.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$193.5M/yr
Uneventful year with regular monitoring, readiness maintenance, personnel costs and routine ops only.
steady_monitoring
no_emergence_event
🚨
Minor Incident
$179.5M/yr
Small exposure or anomalous signal requiring one MTF deployment and targeted cover-up/legal response.
localized_exposure
short_deployment
targeted_coverup
🚨
Major Neutralisation
$1.2B/yr
Amida-class emergence declaration and active neutralisation attempt using additional launches and emergency operations.
emergence_event
Amida-class_declaration
rapid_neutralisation_launches
🚨
Political Exposure
$219.5M/yr
Significant public or international exposure requiring large-scale coverup, litigation and public mitigation.
major_leak
media_exposure
international_dispute
Personnel
126 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 20 | Scientists, mission analysts and gravitation specialists supporting modelling and analysis. [#6] |
| Security Officer / MTF Agent | 80 | Standing MTF Gamma-5 unit personnel for cover, field ops and deployments. [#13] |
| Flight Ops / Mission Control Engineer | 12 | Engineers for spacecraft operations, comms and telemetry. Portions of mission ops staffing. [#2] |
| Research Engineer / HPC Operator | 8 | HPC and modelling operators supporting simulations and trajectory planning. [#5] |
| Administrative Staff | 4 | Program admin, procurement and logistics support. [#14, #15] |
| Site Director / Executive Staff | 2 | Program leadership and executive coordination for interagency/black-ops. [#16, #15] |
Confidence Notes
Costs are built from broad, high-variance ranges in the analyst notes and depend on strategic choices (whether to build directed-energy, procure warheads, number of launches). Large technical, political and black‑budget uncertainties reduce confidence.