SCP-5176
Unknown
~
medium confidence
SCP-5176
Expected annual
$18.0M
One-time setup
$25.0M
Annual recurring
$17.6M
Personnel
38
First-year costs (one-time capital + first-year operations) are dominated by structural remediation, contingency/insurance and potential containment provisioning; recurring annual costs are driven by the Outpost lease, staff wages, and ongoing legal/PR and monitoring. One-time capital totals ~$25.0M while baseline recurring operations are ~$17.58M/year.
One-Time Capital Costs
Total: $25.0M
Annual Recurring Costs
Total: $17.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$17.6M/yr
Normal operational year with no major incidents; routine monitoring, maintenance, and operations only.
no_major_leak
steady_visitor_flow
regular_maintenance
🚨
Minor Incident
$19.6M/yr
Localized public exposure or small structural/food-product failure requiring surge response, limited mass-amnestic use, and municipal payouts.
localized_public_exposure
small_structural_failure
🚨
Major Breach
$27.6M/yr
Widespread leak or structural collapse leading to mass-amnestic deployment, large legal/municipal settlements, and major repairs.
widespread_leak
structural_collapse
political_exposure
🚨
Containment Activation
$25.6M/yr
Active capture/containment operations against SCP-5176-1 requiring emergency engineering, extended surge ops and external coordination.
SCP-5176-1_engagement
full_capture_effort
Personnel
38 total
| Role | Count | Notes |
|---|---|---|
| Field Response Team / MTF Agent | 24 | [#4] 24 full-time operatives/medics/supervisors covering three shifts for rapid response. |
| Research Scientist | 6 | [#11] Memetics/ontokinetics/materials specialists on-site for study of SCP-5176. |
| Lab Technician | 4 | [#11] Lab techs supporting instrumentation and sample processing. |
| Medical Officer | 2 | [#7, #6] Medical staff for observation, amnestic administration and adverse-effect care. |
| Administrative Staff | 2 | [#3, #15] Outpost/site administration and liaison for municipal/legal cover operations. |
Confidence Notes
Analyst notes provide line-item estimates for most categories, but several items (SCP-5176-1 containment, municipal/legal escalations, and engineering for ontokinetic effects) are high-uncertainty and could materially change costs; therefore confidence is medium.