SCP-5194
Unknown
~
medium confidence
SCP-5194
Expected annual
$2.4M
One-time setup
$3.1M
Annual recurring
$2.4M
Personnel
18
Initial one-time capital of approximately $3,100,000 driven primarily by Faraday cage installation, structural work, specialized equipment (shielded monitoring, ROV) and a contingency reserve. Annual recurring costs are approximately $2,368,500 driven mainly by staff wages, power, contracts, maintenance and ongoing research.
One-Time Capital Costs
Total: $3.1M
Annual Recurring Costs
Total: $2.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.4M/yr
Routine year with no major incidents; containment operations continue normally.
normal monitoring
scheduled maintenance
no breaches or interior access
🚨
Minor Incident
$2.5M/yr
Minor activation, RF intrusion, small equipment failure or limited tamper requiring repairs and per-call contractor response.
equipment failure
localized RF breach
per-call salvage/repair
🚨
Major Interior Access
$3.6M/yr
Planned or emergency controlled interior access operation (chemical/power/battery removal or intrusive ROV mission) with high specialist costs.
required interior sampling
battery/fuel removal
specialist ROV/HAZMAT operation
🚨
Memetic Exposure
$3.9M/yr
Broadcasts are determined to carry memetic/cognitohazard effects requiring expanded containment, isolation wards and intensive mitigation.
memetic content confirmed
exposed personnel requiring treatment
expanded isolation measures
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | [#8] 24/7 armed perimeter and access control: ~9 guards across shifts including supervisors/relief. |
| Engineer / Maintenance | 4 | [#9] On-site technical crew for vessel upkeep, cage maintenance, ROV operation and certifications (3–5 staff; mid = 4). |
| Research Scientist / Signal Analyst | 3 | [#10] Signal analysis & cryptanalysis team (2–4 analysts; mid = 3). |
| Memetics Specialist / Psychologist | 1 | [#11] Memetics/psychological screening & mitigation specialist (1 FTE). |
| Administrative Staff | 1 | [#20] Recordkeeping, chain-of-custody and audit labor (1–2 admin staff; mid = 1). |
Confidence Notes
Estimates are based on analyst ranges provided; many line items have wide ranges and the object's memetic/unknown properties create material uncertainty. Capital items are better scoped (higher confidence) than long-term probabilities for anomalous escalations (lower confidence).