SCP-5217
Unknown
~
medium confidence
SCP-5217
Expected annual
$4.6M
One-time setup
$3.8M
Annual recurring
$4.4M
Personnel
14
Initial one-time containment and equipment buildout is roughly $3.75M driven by a hermetic BSL-3+ suite, robotics, and lab/sequencing gear; ongoing annual costs are roughly $4.39M driven by staff salaries, research/monitoring, and a large contingency/eradication reserve.
One-Time Capital Costs
Total: $3.8M
Annual Recurring Costs
Total: $4.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.4M/yr
Normal year with routine operations, training, and no major containment incidents.
routine testing
regular research activity
no incidents
🚨
Minor Incident
$4.6M/yr
Small containment incident (ruptured sack or localized breach) requiring on-site response, limited remediation and equipment replacement.
sack rupture during handling
localized contamination requiring decontamination
🚨
Major Breach
$6.4M/yr
Significant breach leading to multiple escaped emergents, extended field response, public-health coordination, and major remediation.
multi-sack rupture
loss of HVAC/backup power
human error during transfer
🚨
Catastrophic Release
$29.4M/yr
Widespread release or establishment of emergents requiring nationwide or international eradication campaigns and major public-exposure mitigation.
failure of multiple redundancies
public exposure / media leaks
establishment of invasive/emergent species
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Molecular Biologist | 2 | Senior containment researchers/geneticists responsible for sequencing, experimental design, and oversight (salaries included in staff_wages). |
| Veterinarian | 1 | Exotic/zoonotic-capable veterinarian for embryo/animal care and medical oversight. |
| Containment Technician / Animal-Care Technician | 2 | Day-to-day husbandry, sample handling, and containment maintenance. |
| Project Lead | 1 | Program lead for Project REPLENISH and experimental authorization. |
| Security Officer / MTF Agent | 8 | 24/7 armed/authorized security staff including supervisory coverage to enforce two-person rule and secure transfers. |
Confidence Notes
Line-item ranges are based on the analyst notes and typical procurement/service costs; core recurring payroll and contingency assumptions are reasonably estimated but eradication and public-exposure costs are highly uncertain, so overall confidence is medium.