SCP-5219
Safe
~
medium confidence
SCP-5219
Expected annual
$1.3M
One-time setup
$687K
Annual recurring
$1.2M
Personnel
11
One-time capital and containment setup (robotics, refrigeration, secure hardware) are ~$687k; annual recurring operations (dominated by guard staffing, memetics oversight, and investigative budgets) are about $1.24M/yr.
One-Time Capital Costs
Total: $687K
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal year with no major incidents; routine containment, preservation, memetics oversight, and occasional testing.
no incidents
scheduled testing only
standard staffing levels
🚨
Minor Incident
$1.3M/yr
Small accidental exposure or attempted interaction that requires amnestics, overtime, counseling, and limited repairs/replacement.
accidental viewing
small security breach
localized equipment repair
🚨
Major Breach
$1.5M/yr
Significant security incident or attempted removal requiring emergency response, heavy overtime, equipment replacement, and elevated memetic research support.
coordinated removal attempt
security failure
large-scale containment response
🚨
Research Breakthrough Requiring Scale Up
$1.6M/yr
Discovery that SCP-5219 is part of a larger memetic phenomenon requiring expanded cross-site research and scaled containment protocols.
new memetic links discovered
expanded cross-site investigation
decision to fund major research program
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#1] Eight FTE guards to maintain 24/7 two-guard coverage (accounts for shifts, vacations, and relief). |
| Security Supervisor / Manager | 1 | [#2] Part-time supervisory/admin oversight for scheduling, incident reporting and HR coordination (0.25 FTE aggregated to one position). |
| Research Scientist (Memeticist) | 1 | [#12] Memetics researcher allocated (0.5–1.0 FTE aggregated to one responsible person for oversight). |
| Research Technician | 1 | [#12] Research technician (0.5 FTE aggregated to one person assisting memeticist and sampling operations). |
Confidence Notes
Numerical estimates originate from analyst ranges present in notes; staffing and equipment costs are well-defined but memetic effects, contingency choices, and long-term research scale are uncertain, producing medium confidence.