SCP-5261
Unknown
?
low confidence
SCP-5261
Expected annual
$8.0M
One-time setup
$4.7M
Annual recurring
$7.5M
Personnel
33
One-time capital expenditures (~$4.7M) are driven by site upgrades, boats/ROVs, and research lab setup; recurring annual costs (~$7.5M/yr) are driven by staff wages, contingency reserves, research/monitoring, and legal/cover operations.
One-Time Capital Costs
Total: $4.7M
Annual Recurring Costs
Total: $7.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.5M/yr
Normal year with routine monitoring, occasional small incidents handled within reserves, and regular research and maintenance.
no_major_incident
routine_operations_and_maintenance
🚨
Minor Incident
$7.8M/yr
Single-site small-to-moderate SCP-5261 event (pet store or small aquarium) requiring rapid-response deployment, amnestics, limited reimbursements, and forensic follow-up.
small_store_or_tank_escape
localized_dispersal
🚨
Major Breach
$12.5M/yr
Large aquarium-level emptying or multi-site coordinated event requiring extensive recapture, major PR/legal response, and temporary expansion of holding capacity.
large_aquarium_emptying
networked_tunnel_release
🚨
Catastrophic Event
$27.5M/yr
Giant Ocean Tank–scale catastrophe with multi-million reconstruction, long-term environmental remediation, and major public exposure/legal fallout.
giant_ocean_tank_scale_event
major_public_exposure
Personnel
33 total
| Role | Count | Notes |
|---|---|---|
| Rapid Response Team (marine/diver/boat operator/medic/security) | 8 | 24/7 on-call multi-disciplinary response team for field captures and transport; maps to [#2]. |
| Research Scientist | 3 | Small research team studying hive-mind mechanisms, containment/nullification; maps to [#12]. |
| Security Officer / Guard | 12 | Site-82 and temporary-holding security staffing for 24/7 coverage; maps to [#16]. |
| Veterinary Officer / Aquarist | 2 | Specialized marine veterinary staff for intake/quarantine and ongoing husbandry; maps to [#10]. |
| Webcrawler / Social Media Analysts | 3 | J/M-CON maintenance and triage analysts for monitoring social/news leads; maps to [#1]. |
| Engineer / Maintenance | 2 | Technical staff for RAS, ROVs, boats, and facility upkeep; maps to [#3, #23, #15]. |
| Administrative Staff | 2 | Legal/PR/admin coordination for cover stories, permits, and interagency liaison; maps to [#6, #19, #25]. |
| Medical Officer | 1 | Oversees amnestic administrations, medical readiness, and medevac contracts; maps to [#7, #18]. |
Confidence Notes
Estimates are low-confidence due to wide ranges in analyst notes, unpredictable event frequency/scale, and large contingent/one-off costs for catastrophic scenarios.