SCP-5281
Da'aS
~
medium confidence
SCP-5281-D
Expected annual
$607K
One-time setup
$734K
Annual recurring
$590K
Personnel
6.5
First-year one-time setup costs are approximately $734,500 driven by containment suite construction, HVAC, data/legal setup and an incident contingency reserve; ongoing annual costs are approximately $590,500 dominated by personnel wages (security/research/handling) and recurring conservation, storage, and operational overhead.
One-Time Capital Costs
Total: $734K
Annual Recurring Costs
Total: $590K/yr
Cost Scenarios
📊
Baseline
(baseline)
$590K/yr
Normal year with no major incidents; routine operations, staff and conservation activities only.
steady production rate
normal conservation schedule
no contamination or legal incidents
🚨
Minor Incident
$640K/yr
Small contamination event or short-term spike in garment production requiring overtime, emergency conservation and increased disposal.
localized contamination
temporary conservation backlog
small surge in production
🚨
Major Breach
$790K/yr
Large-scale production spike or contamination event requiring emergency expansion of storage, rapid conservation, medical response and possible temporary facility upgrades.
mass garment production
widespread contamination
multiple hospitalizations or facility damage
🚨
Legal Exposure
$740K/yr
FOIA/public exposure or legal challenge requiring intensive PR/legal defense, potential relocation or large cover-up operations.
unauthorized disclosure
public inquiry/FOIA litigation
third-party organization pressure
Personnel
6.5 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#4] 24/7 guard coverage (4 guards to staff 2 positions plus leave). |
| Research Scientist | 1 | [#5] Assigned anomalous researcher (1 FTE lead) for study, protocols and daily logs. |
| Medical Officer | 0.5 | [#6] Part-time/on-call nurse or medic retainer for routine checks and infection control. |
| Engineer / Maintenance / Textile Technician | 1 | [#7] Custodial/textile handling technician (1 FTE) for garment collection, basic cleaning and tagging. |
Confidence Notes
Analyst notes provide detailed line items and ranges, but many estimates are ranges and the long-term garment production rate (which drives storage/conservation scale) is uncertain, so cost estimates are moderate confidence.