SCP-5286
Unknown
~
medium confidence
SCP-5286
Expected annual
$1.1M
One-time setup
$930K
Annual recurring
$1.1M
Personnel
6
Estimated one-time capital of approximately $930,000 driven by cell construction, meal-prep/incineration upgrades, and research kit; recurring annual costs ~ $1.08M driven by staff wages, research/monitoring, legal/cover-up, and ongoing disposal/consumables.
One-Time Capital Costs
Total: $930K
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal uneventful year with regular production rates and no major incidents.
steady clone production
routine transfers and disposal
no containment incidents
🚨
Minor Incident
$1.1M/yr
Localized containment incident requiring mobilization, a few emergency surgeries, extra disposal and overtime.
localized swarm or escape of multiple SCP-5286-1
emergency surgical removals
short-term increased disposal and overtime
🚨
Major Breach
$1.6M/yr
Large-scale breach or exposure requiring full mobilization, large legal/cover-up expenses, replacement equipment, and extensive investigations.
mass emergence of SCP-5286-1
containment failure requiring extended response
significant public exposure/legal action
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#4] Two FTE security positions to perform daily sweeps, secure instances, and handle transfers. |
| Research Scientist | 2 | [#16] Dedicated research personnel (1–2 FTE) for study, monitoring, and mitigation R&D. |
| Dietitian | 1 | [#8] Dedicated dietitian for SCP-5286's specialized meal preparation and coordination. |
| Food Prep Technician | 1 | [#8] At least one trained prep technician to prepare/mash/desiccate matter and integrate SCP-5286-1 into meals. |
Confidence Notes
Analyst notes provide detailed per-item ranges and many recurring drivers, enabling a medium confidence estimate; key remaining uncertainties are production frequency of SCP-5286-1 (scales recurring costs), choice between on-site incineration vs. contract disposal, and local labor/contractor pricing which could shift both one-time and recurring totals.