Expected annual
$1.4M
One-time setup
$7.2M
Annual recurring
$1.4M
Personnel
11
Initial one-time setup (containment modifications, lab instrumentation, and contingency reserves) is approximately $7.17M, with yearly operations dominated by security and dedicated research staff at roughly $1.38M/yr. Main cost drivers are armed security and dedicated research salaries, high-end analytical instrumentation (purchase + maintenance), and contingency/reserve funding for catastrophic remediation.
One-Time Capital Costs
Total: $7.2M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year with no major incidents; ongoing operations, scheduled maintenance, and routine testing only.
no security breaches
routine QC and maintenance only
🚨
Minor Incident
$1.5M/yr
Localized unauthorized dosing or single-person overdose requiring termination/autopsy, internal investigation and limited public cover-up.
unauthorized dose >200µg
single-subject medical/legal response
🚨
Major Breach
$4.0M/yr
Theft or diversion of multiple aliquots requiring large-scale remediation, public containment, and significant legal/operational response.
theft of multiple aliquots
localized public exposures
🚨
Catastrophic Breach
$21.4M/yr
Widespread distribution or mass exposure requiring mass amnestic operations, evacuation, and large-scale remediation/settlements.
mass distribution
major public exposure
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#6] 24/7 armed coverage requiring 6–8 guards to cover shifts; wage assumptions included in staff_wages. |
| Research Scientist | 1 | [#7] Lead Researcher oversight (Level 4 clearance) included in staff_wages. |
| Research Technician | 3 | [#7] 2–3 technicians assigned to SCP-5318 duties; wages included in staff_wages. |
Confidence Notes