SCP-534
Euclid
✓
high confidence
SCP-534
Expected annual
$1.6M
One-time setup
$1.9M
Annual recurring
$1.5M
Personnel
12
Estimated initial one-time capital of $1,860,000 primarily driven by containment chamber, HVAC, robotics, suits and research equipment; recurring annual costs ~ $1,517,000/yr dominated by staff wages and facility overhead.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Normal operational year with no major incidents; routine containment, scheduled research, and standard maintenance.
routine_operations
no_breach
scheduled_research
🚨
Minor Incident
$1.6M/yr
Small containment incident (limited release or localized clotting/contamination) requiring contractor cleanup, overtime pay, consumable replacement and medical treatment for affected staff.
localized_release
suit_puncture
small_clotting_event
🚨
Major Breach
$2.8M/yr
Significant containment breach with wide-area contamination risk, large-scale decontamination, heavy contractor engagement, legal/PR costs and potential loss of irreplaceable samples.
large_release
facility_evacuations
public_exposure
🚨
Research Scale Up
$2.7M/yr
Policy decision to scale containment and research (multiple redundant chambers, additional staff and equipment), incurring large one-time capital and first-year scaling costs.
redundancy_scale_up
multiple_chambers
expanded_staffing
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / PI | 1 | [#10] Principal investigator overseeing SCP-534 research and containment studies. |
| Research Scientist | 2 | [#10] Full-time researchers conducting assays and monitoring. |
| Research Technician | 2 | [#10] Technicians for sampling, maintenance of experiments, and containment support. |
| Security Officer / MTF Agent | 6 | [#12] Rotational security staff to maintain 24/7 coverage. |
| Security Supervisor | 1 | [#12] Supervisor for security team and access control enforcement. |
Confidence Notes
Analyst notes provide detailed line-item estimates for capital and recurring items; major remaining uncertainties are annual frequency of transfers and low-probability breach costs, which affect scenario probabilities but not base operational budgeting.