SCP-5352
Euclid
~
medium confidence
SCP-5352
Expected annual
$1.9M
One-time setup
$5.6M
Annual recurring
$1.9M
Personnel
17
Initial capital outlay is dominated by contingency/resilience reserves and large-scale planning (~$3.25M) and major equipment purchases (sensors, PRECESSION kit, vehicles ~$1.25M); ongoing annual operations (monitoring, research, salaries, maintenance) run about $1.859M/yr.
One-Time Capital Costs
Total: $5.6M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Routine year with scheduled monthly missions, ongoing research and normal maintenance; no major incidents.
routine_monthly_operations
scheduled_research_activity
🚨
Minor Incident
$2.4M/yr
Localized incident during a mission causing casualties, sensor losses and a PRECESSION deployment for a single structure.
single-mission_casualty
localized_sensor_and_equipment_loss
targeted_PRECESSION_deployment
🚨
Catastrophic Breach
$4.9M/yr
Major expansion/escape or mass-casualty event requiring large-scale containment, evacuations and use of planning reserve for reality-mitigation.
anomaly_expansion
mass_casualties
large-scale_PRECESSION_and_reality_mitigation
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Monitoring Operator | 3 | [#1] 24/7 monitoring operators and console staff for remote monitoring suite (2–3 operators noted). |
| IT / Systems Administrator | 1 | [#1] IT support for secure datalinks, servers and encryption key management. |
| Security Officer / MTF Agent | 4 | [#6, #16] Field agents and local rapid-response/security contracts used for missions and perimeter patrols (pro-rated agent salaries and guard contracts). |
| Research Scientist | 3 | [#6, #14, #19] Researchers dedicated to anomalous-property study, countermeasure R&D and analysis; includes part-time mission researcher plus research-program staff. |
| Engineer / Maintenance | 2 | [#3, #11] Sensor technicians and maintenance staff/contractors for site upkeep, calibration and drone/UGV maintenance. |
| Medical Officer / Trauma Medic | 1 | [#8] Medical liaison / on-call medevac/trauma support coordination. |
| Administrative Staff | 1 | [#25, #15] Admin, records redaction, permits and liaison responsibilities. |
| Class-D Personnel | 2 | [#5, #7] Rotating D-Class assigned to monthly missions (2 per mission; pool maintained). |
Confidence Notes
Most line items include analyst estimates and explicit split between capital and recurring costs, giving moderate confidence; uncertainty centers on the chosen size of the catastrophic planning reserve, long-term R&D scaling if non-visual sensing fails, and incident frequency/severity.