SCP-5387
Euclid
~
medium confidence
SCP-5387
Expected annual
$11.0M
One-time setup
$3.0B
Annual recurring
$10.4M
Personnel
18
One-time establishment and catastrophic-reserve costs dominate (≈$2.96B one-time) driven by a large contingency fund, buffer land acquisition and optional hardened relocation; recurring operations are modest by comparison at ≈$10.36M/yr driven by research/security payroll, MTF readiness and public-health contingency.
One-Time Capital Costs
Total: $3.0B
Annual Recurring Costs
Total: $10.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.4M/yr
Normal operational year with no significant incidents; routine containment, research and readiness activities only.
no_broadcast_breach
routine_maintenance
scheduled_research
🚨
Minor Incident
$10.5M/yr
Isolated unauthorized broadcast or single exposure requiring localized response, additional amnestics and limited field operations.
single_broadcast_exposure
localized_termination
small_amnestic_campaign
🚨
Major Breach
$20.4M/yr
Containment breach leading to one or more SCP-5387-B/C detonations or large field operations requiring rebuild, decontamination and major MTF action.
localized_detonation
site_damage
major_retrievals
🚨
Catastrophic Breach
$510.4M/yr
Detonation of an SCP-5387-B/C in or near populated areas causing mass casualties, national-level response, and massive remediation/cover-up costs.
population_center_detonation
wide_spread_exposure
international_response
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Lead Researcher | 1 | [#9] Senior researcher / head researcher responsible for approvals and oversight. |
| Research Scientist | 3 | [#9] Full-time research scientists conducting analysis and trials (2–3; rounded up). |
| Lab Technician | 4 | [#9] Lab technicians for daily sample handling, recording and sample prep (3–4; rounded up). |
| Horticulturalist | 1 | [#9] Dedicated horticulturalist for plant care and daily trimming. |
| Security Officer / Site Guard | 9 | [#10] Armed security staff for perimeter and internal facility checks (6–12; midpoint used). |
Confidence Notes
Line items and ranges are fairly well-documented in analyst notes for operational and equipment costs (medium confidence), but extreme tail risks (site-buffer sizing, catastrophic reserve and underground relocation feasibility) have large uncertainty which lowers overall confidence.