SCP-5399
Safe
~
medium confidence
SCP-5399
Expected annual
$305K
One-time setup
$101K
Annual recurring
$288K
Personnel
4.44
Initial capital costs are moderate (~$100k) driven by airlock/sensors/integration and a contingency reserve; ongoing annual costs are personnel‑heavy (wages, hazard pay, medical/training) totaling roughly $288k/yr.
One-Time Capital Costs
Total: $101K
Annual Recurring Costs
Total: $288K/yr
Cost Scenarios
📊
Baseline
(baseline)
$288K/yr
Typical uneventful year with normal staffing, maintenance, training, and research activity.
normal operations
no breaches
routine maintenance and training
🚨
Minor Incident
$303K/yr
Short demanifestation, missed relief, or localized noncompliance requiring overtime, temporary containment measures, and small repairs.
missed relief / short demanifestation
staff refusal requiring overtime
localized relocation/temporary quarantine
🚨
Major Breach
$438K/yr
Violent or destructive breach targeting the containment cell (arson, attempted destruction) causing significant repairs, investigation, and medical/legal costs.
arson or deliberate destruction
violent extraction attempts
major property damage to cell or adjacent areas
🚨
Catastrophic Breach
$2.8M/yr
Site‑level catastrophic event initiated or exacerbated by containment failure (large fire, mass damage) requiring major reconstruction, site evacuation, and long-term recovery.
site-wide fire or major destructive event
mass-casualty incident
loss of containment cameras/systems enabling escalation
Personnel
4.44 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 3 | [#1] Three FTEs providing continuous 24/7 containment coverage (three 8-hour shifts). |
| Rapid Response Security (on-call) | 0.67 | [#2] 0.5–1.0 FTE equivalent for monitoring and incident response. |
| Compliance / Administrative Staff | 0.33 | [#6] 0.25–0.5 FTE for log review, scheduling, and recordkeeping. |
| Research Scientist | 0.44 | [#14] 0.2–0.5 FTE allocated for basic study and mitigation experiments (salary portion included in staff_wages). |
Confidence Notes
Estimates are based on analyst-provided ranges and standard Foundation staffing/equipment assumptions; core labor needs are well-defined but contingency and breach costs are highly uncertain, producing moderate confidence.