SCP-5405
Euclid
?
low confidence
SCP-5405
Expected annual
$13.8M
One-time setup
$222.4M
Annual recurring
$12.2M
Personnel
45
One-time capital and site-establishment costs are very large (~$222.45M) driven by perimeter construction, land acquisition, contingency reserve, SRA procurement and base/lab buildout; steady-state recurring operations run roughly $12.225M/year driven by security staffing, logistics/MTF readiness, and ongoing research/monitoring.
One-Time Capital Costs
Total: $222.4M
Annual Recurring Costs
Total: $12.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$12.2M/yr
Normal year with routine operations, no large breaches or major remediation actions.
routine operations
scheduled maintenance
no containment breaches
🚨
Minor Incident
$12.6M/yr
Localized breach requiring MTF deployment, short removal operations, and extra logistics/data processing.
single localized breach
one or two MTF deployments
extra UAV/sensor ops and disposables
🚨
Major Breach
$62.2M/yr
Significant spread or repeated large removals requiring emergency perimeter expansion, mass remediation, and heavy use of contingency funds.
rapid expansion/spread
multiple large-scale removals
major environmental remediation and legal exposure
Personnel
45 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | [#7] 24/7 permanent security roster for perimeter patrols and rapid dispatch (roster of ~30 guards). |
| Research Scientist | 8 | [#14] Xenobotanists, epidemiologists, and lab scientists (8 staff as in analyst notes). |
| SRA Technician | 3 | [#6, #5] Specialized technicians for SRA maintenance and deployment operations (wages included in staff_wages). |
| UAV Pilot / Technician | 2 | [#11, #12] Operators and data technicians for daily mapping and long-endurance drone operations. |
| Medical Officer | 2 | [#22] On-site medical/occupational health staff for screenings, contamination response, and psychological care. |
Confidence Notes
Key items (SRA hardware, land/indigenous settlements, and non-euclidean behavior) have large uncertainty ranges; containment behavior could materially change cost profile, so estimates rely on mid-range assumptions from analyst notes.