SCP-545
Euclid
✓
high confidence
SCP-545
Expected annual
$3.3M
One-time setup
$4.8M
Annual recurring
$3.3M
Personnel
12
One-time setup and capital expenditures are approximately $4.84M (driven by lab build, high-end instrumentation, vault and contingency reserve). Recurring annual costs are approximately $3.256M/year, driven mainly by security staffing, ongoing research, and covert legal/cover operations.
One-Time Capital Costs
Total: $4.8M
Annual Recurring Costs
Total: $3.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.3M/yr
Normal year with no major incidents; routine operations, research cadence, and scheduled production events.
routine_research
scheduled_production_batches
no_security_incidents
🚨
Minor Incident
$3.5M/yr
Limited unauthorized access or small-scale incident requiring RRT response, temporary lockdown, medical treatment for exposed personnel, and limited legal/cover operations.
unauthorized_access
small_scale_theft_attempt
limited_exposure_event
🚨
Major Breach
$8.3M/yr
Significant containment breach or public exposure involving loss/theft of SCP-545-B or SCP-545-C, requiring mass decontamination, legal settlements, emergency relocations, and large-scale remediation.
public_exposure
loss_of_sample_supply
large_scale_theft_or_release
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Level-2 | 6 | [#11] Six FTE Level-2 guards for escort and nearby response (24/7 coverage as described). |
| Security Officer / Level-4 Handler | 3 | [#12] Three FTE Level-4 handlers for handling and transport of SCP-545-B. |
| Medical Officer | 1 | [#13] Primary care physician for monitoring SCP-545-A and medical contingency. |
| Nurse | 1 | [#13] Part-time nurse-equivalent included as a 1 FTE for vitals/infusion monitoring in staffing cost estimate. |
| Psychiatrist / Mental-Health Specialist | 1 | [#13, #25] Psychiatrist for addiction oversight and ongoing psychological risk mitigation. |
Confidence Notes
Detailed line-item analyst notes provide explicit one-time and recurring estimates for all major categories (construction, lab build, instrumentation, staffing, legal/cover ops, and multi-year research), enabling a high-confidence aggregate.