SCP-5477
Euclid
~
medium confidence
SCP-5477
Expected annual
$4.5M
One-time setup
$67.7M
Annual recurring
$4.3M
Personnel
12
First-year capital costs are dominated by facility construction, emergency reserve and R&D/failsafe programs (~$67.7M one-time in this estimate). Ongoing annual operations are driven by staff wages, research/robotics, redundancy R&D operations and contingency/cover costs (~$4.35M/yr).
One-Time Capital Costs
Total: $67.7M
Annual Recurring Costs
Total: $4.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.3M/yr
Normal operational year with routine maintenance, research, staffing and no major incidents.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$4.5M/yr
Contained mechanical failure, loss of expendable probes or a localized equipment replacement event requiring emergency repairs and probe replacements.
elevator/mechanical_fault
robotics_loss
🚨
Major Incident
$6.8M/yr
Partial containment breach or significant failure requiring site-level remediation, legal/PR response and sizable equipment replacement.
major_equipment_failure
significant_D-class_casualty
🚨
Catastrophic Remediation
$29.3M/yr
Disappearance or collapse/unexpected large-scale geotechnical event requiring large-scale mobilization and deployment of the emergency reserve.
SCP_disappearance
massive_geotechnical_instability
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#5] 24/7 coverage using a 3-shift rotation; counted toward security staffing wages. |
| Engineer / Maintenance | 4 | [#6] Mechanical/electrical/robotics technicians on-call and scheduled for maintenance; counted toward engineering wages. |
Confidence Notes
Line-item ranges and contingency/reserve size are high-uncertainty items; many recurring costs and staffing levels are well-described, but emergency reserve and R&D scope remain speculative, so a medium confidence is appropriate.