SCP-550
Euclid
~
medium confidence
SCP-550
Expected annual
$810K
One-time setup
$304K
Annual recurring
$797K
Personnel
8.75
First-year startup costs are roughly $304,000 for containment build-out and equipment; ongoing annual costs are dominated by staffing and operational support (~$797k/yr). Major cost drivers are personnel, contingency reserves, and recurring hazardous-waste/logistics costs.
One-Time Capital Costs
Total: $304K
Annual Recurring Costs
Total: $797K/yr
Cost Scenarios
📊
Baseline
(baseline)
$797K/yr
Normal operational year with routine provisioning, maintenance, and no major incidents or program expansions.
scheduled provisioning
routine maintenance
no incidents
🚨
Minor Incident
$827K/yr
Minor containment incident such as an acid spill, small exposure, or limited extra cleanup and medical treatment.
small acid spill
medical treatment for exposure
local contractor cleanup
🚨
Major Breach
$1.0M/yr
Significant containment breach or contamination event requiring major repairs, replacement of chamber, legal response, and extensive remediation.
structural containment failure
large spill or prolonged contamination
public exposure/legal action
🚨
Research Scaleup
$897K/yr
Initiation of a small long-term study/upgrade program, adding recurring research staff/FTEs and equipment to expand analysis.
program approval
funding allocation
additional FTEs/equipment
Personnel
8.75 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#6] Six guards (2 per shift, 3 shifts) to provide 24/7 security coverage. |
| Hazmat Technician | 1 | [#6] One full-time hazmat technician for safe handling, decontamination and training. |
| Research Scientist | 0.75 | [#6, #11] ~0.5–1.0 FTE research/monitoring scientist (pro-rated) responsible for assays and monitoring. |
| Biohazard Technician / Janitorial | 0.5 | [#6] ~0.5 FTE for biohazard cleanup and routine chamber cleaning after provisioning. |
| Administrative Staff | 0.5 | [#6, #16] ~0.5 FTE administrative support for procurement paperwork, legal coordination, and record-keeping. |
Confidence Notes
Analyst notes provide detailed line items and reasonable mid-range estimates, but many items have wide ranges (material choices, contractor rates, and optional program choices). Personnel/staffing assumptions and contingency sizing introduce moderate uncertainty.