SCP-5517
Unknown
~
medium confidence
SCP-5517
Expected annual
$2.9M
One-time setup
$3.7M
Annual recurring
$2.8M
Personnel
28
First-year outlay is dominated by facility construction, specialized equipment (HVAC, incinerator, generators, custom costotomes) and contingency reserves (~$3.68M one-time). Ongoing annual costs are driven by staff wages, maintenance, research/monitoring and replacement reserves (~$2.818M/yr).
One-Time Capital Costs
Total: $3.7M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal year with routine containment, scheduled research, maintenance, and no major incidents.
routine operations
scheduled sample shipments
planned training and maintenance
🚨
Minor Incident
$3.0M/yr
Isolated breach or small uncontrolled maturation event requiring emergency response, overtime, limited remediation and medical care.
isolated release
limited contamination
small-scale fire or personnel exposure
🚨
Major Breach
$5.3M/yr
Significant containment failure (large fire, uncontrolled spread, major contamination) requiring full remediation, legal settlements, equipment replacement and possible site shutdown.
large uncontrolled fire
major structural breach
widespread environmental contamination
Personnel
28 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#11] Twelve full-time guards for continuous coverage (two on at a time, rotation). |
| Rapid Response / Tactical Team | 6 | [#12] On-call rapid response personnel to handle breaches and aggressive SCP-5517-2 behavior. |
| Research Scientist | 3 | [#13] Scientific lead + senior researchers (1 lead + 2 senior researchers). |
| Laboratory Technician | 3 | [#13] Laboratory technicians supporting assays, sample prep and LIMS. |
| Medical Officer | 3 | [#14] On-site physician, clinical nurse, and occupational health coverage. |
| Engineer / Maintenance | 3 | [#20] Facilities/maintenance technicians for HVAC, electrical, fence and power systems. |
| Administrative / Documentation Staff | 1 | [#26] Records, audit and compliance staffing to maintain logs and oversight. |
Confidence Notes
Estimates are derived directly from analyst line items but many figures were given as ranges or 'reserve' values. Exact costs depend on choices between on-site purchase vs contracted services, local construction costs, and incident frequency; therefore medium confidence.