SCP-5556 Unknown ~ medium confidence
SCP-5556
Expected annual
$1.2M
One-time setup
$1.5M
Annual recurring
$1.2M
Personnel
13
Estimated upfront capital of $1,452,500 to build a single blast-rated suite with robotics, sensors and lab setup; recurring annual costs ~ $1,164,000 driven primarily by staff wages (technicians, researchers, security), insurance, and ongoing maintenance/monitoring.
🏗️ One-Time Capital Costs Total: $1.5M
Facilities $465K
[#1, #7, #26] Blast-rated miniature containment suite, HVAC install, and soundproofing/visual isolation for a single suite.
Equipment $430K
[#2, #3, #5, #11, #20] Redundant modular containment cells kit, remote handling robotics and manipulators, high-resolution CCTV/ sensors (hardware portion), EOD tools, and initial EOD/PPE suits purchase.
Contingency Reserve $300K
[#28] Reserve fund for additional suites or replacement of destroyed modules after unexpected higher-yield detonations.
Initial Research And Lab Setup $210K
[#24, #25] Research lab space and instruments (microscopes, mass spec, data hardware) and a test-proxy bench for remote stimulus/testing.
Backup Power And Generator $35K
[#14] UPS/backup generator to sustain manipulators, cameras and ventilation during outages.
Sacrificial Liners Initial Stock $12K
[#9] Initial stock of sacrificial detonation trays/liners.
🔄 Annual Recurring Costs Total: $1.2M/yr
Staff Wages $820K/yr
[#16, #17, #19] Salaries and benefits for containment technicians (3), research staff (2), and security guards (8) providing 24/7 coverage and research operations.
Insurance And Catastrophic Reserve $150K/yr
[#29] Insurance/catastrophic-loss reserve to cover accidental wider damage or major structural repairs.
Cover Story And Legal $50K/yr
[#27] Policy, legal and cover/liaison expenses for plausible deniability, legal counsel and cover operations.
Research And Monitoring $33K/yr
[#5, #6, #23] Recurring data storage/analysis and monitoring costs for sensors/video plus recurring forensic/biological/pathological analysis budget.
Robotic Maintenance And Calibration $25K/yr
[#4] Periodic calibration, replacement end-effectors, spare parts, software updates and service contracts for manipulators.
Administrative Overhead $25K/yr
[#30] Administrative overhead, recordkeeping, audits and clearance renewals.
Facilities Maintenance $14K/yr
[#8, #13, #15] HVAC filter replacement and maintenance, structural inspection and minor repairs, fuel/tests for generator/UPS.
Supplies And Consumables $13K/yr
[#10, #31] Consumable replacement for sacrificial liners and per-instance consumables (food, bedding, enrichment).
Logistics And Transport $10K/yr
[#12] Post-detonation cleanup, hazardous-waste disposal and transport per-event aggregated into annual budget.
Psychological Counseling $10K/yr
[#22] Staff counseling, resiliency programs and rotation costs for personnel exposed to traumatic detonations or persuasive attempts.
Ppe Maintenance And Medical Readiness $8K/yr
[#21] PPE maintenance, medical supplies, recertification and emergency response standby for testing.
Training And Drills $6K/yr
[#18] Ongoing training updates, SOP development and drills.
Cost Scenarios
📊 Baseline (baseline) $1.2M/yr
83.0% probability / year
Normal operational year with routine maintenance, no major incidents.
no_significant_detonations routine_testing_only
🚨 Minor Incident $1.2M/yr
15.0% probability / year +$30K vs baseline
One or a few contained detonations causing limited module loss and cleanup/forensic work.
single_detonation_event limited_structural_damage module_replacement
🚨 Major Breach $2.4M/yr
2.0% probability / year +$1.2M vs baseline
Large or unexpected high-yield detonation causes structural damage, multiple module loss, major repairs and legal/PR response.
multiple_simultaneous_detonations structural_failure third_party_damage
👥 Personnel 13 total
Role Count Notes
Containment Technician 3 [#16] Trained technicians to run remote systems, perform cleaning, logging and routine maintenance.
Research Scientist 2 [#17] Behavioral researchers and explosives analysts to investigate triggers and develop proxies.
Security Officer / MTF Agent 8 [#19] 24/7 perimeter and access control staffing (three shifts plus relief).
📋 Confidence Notes
Analyst notes provide detailed line items and ranges allowing a mid-confidence estimate, but explosive yield uncertainty and event frequency introduce material variance to both capital contingency and annual incident costs.
← SCP-5555 ↑ All SCPs SCP-5557 →