SCP-5580
Neutralised
~
medium confidence
SCP-5580
Expected annual
$2.7M
One-time setup
$8.3M
Annual recurring
$2.6M
Personnel
21
Estimated one-time setup costs are dominated by archival reclamation, contingency reserves and potential demolition; recurring costs are dominated by staff wages, legal/insurance and logistics (air support and vehicle operations). Baseline recurring spend is roughly $2.6M/yr, with initial setup near $8.29M.
One-Time Capital Costs
Total: $8.3M
Annual Recurring Costs
Total: $2.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.6M/yr
Normal uneventful year with ongoing perimeter security, monitoring, legal cover and information operations but no major incidents.
no breaches
routine maintenance
ongoing archival suppression
🚨
Minor Incident
$2.9M/yr
Localized event (trespass, small leak or discovery) requiring rapid-response field ops, targeted archival takedowns and extra legal/PR work.
trespass or media tip
targeted archival exposure
small-scale recovery operation
🚨
Major Breach Or Demolition
$6.6M/yr
Major political incident, decision to demolish/stabilise ruins or a large-scale exposure requiring demolition, emergency diplomatic response and global archival suppression.
political exposure
decision to demolish ruins
large-scale archival disclosures
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Local Guard | 12 | [#7] Local guard force providing 24/7 perimeter coverage; estimate based on 12 guards. |
| Security Supervisor / Field Chief | 3 | [#7] Supervisory cadre and specialized Foundation security presence. |
| Remote Monitoring Analyst / Technician | 4 | [#8] Control-room staff/analysts to triage CCTV and sensor feeds with 24/7 shift rotations. |
| Site Director / Executive Staff | 1 | [#25] Program lead responsible for liaison, reporting and high-level coordination. |
| Medical Officer | 1 | [#19] On-call medical/evacuation coordinator and medevac liaison for remote operations. |
Confidence Notes
Estimates are mid-range selections from wide analyst ranges; many items (diplomatic, archival and demolition costs) have large jurisdictional/political variance, so totals are approximate but grounded in presented ranges.