SCP-5580 Neutralised ~ medium confidence
SCP-5580
Expected annual
$2.7M
One-time setup
$8.3M
Annual recurring
$2.6M
Personnel
21
Estimated one-time setup costs are dominated by archival reclamation, contingency reserves and potential demolition; recurring costs are dominated by staff wages, legal/insurance and logistics (air support and vehicle operations). Baseline recurring spend is roughly $2.6M/yr, with initial setup near $8.29M.
🏗️ One-Time Capital Costs Total: $8.3M
Demolition Or Stabilization $2.8M
[#26] One-time full demolition/stabilisation of ruins if politically/operationally required (mid-range of very wide estimate).
Contingency Reserve $1.1M
[#18] One-time reserve fund for immediate R&D and emergent anomaly response (mid-range of suggested reserve).
Archival Record Reclamation $1.1M
[#12] Costs for locating, reclaiming, altering or physically expunging archival records across institutions (multi-country work scaled mid-range).
Legal And Diplomatic Initial $550K
[#10] One-time negotiation/compensation and setup of land-access agreements, permits and diplomatic cover arrangements.
International Publication Suppression $550K
[#22] One-time costs for cross-border legal actions, local counsels or clandestine suppression operations (mid-range).
Facilities $400K
[#1, #2] Perimeter fencing (~8–9 km), gates/signage and prefab guard huts/checkpoints (3–5 posts).
Information Operations Initial $300K
[#14] Upfront creation and seeding of cover narratives, content replacement and purchase/setup of domains/social assets (initial outlay).
Equipment $250K
[#3] Perimeter surveillance hardware (CCTV/thermal towers, ground sensors, communications backhaul) - hardware+installation.
Covert Recovery Ops $200K
[#15] Covert field operations to locate Matilda Burnley (investigation, travel, safe-house and potential extraction costs; mid-range one-time).
Linguists Historians Initial $190K
[#16] One-time project hiring of specialist linguists, historians and archivists for translations, provenance work and redaction planning.
Community Relations Fund $175K
[#11] Initial community payments, compensation, or development projects to secure local cooperation.
Site Vehicles Purchase $170K
[#5] Purchase of 4x4 patrol trucks and ATV / remote-area vehicle upgrades (one-time purchase).
Forensic Digital Recovery $150K
[#17] One-time expenditure on digital forensics, specialised hardware and cryptanalysis for encrypted/archive recovery.
Power Infrastructure $140K
[#4] Off-grid power: solar arrays, batteries and backup generator installation (one-time installation cost).
Site Stabilization $125K
[#9] One-time structural/geotechnical stabilisation or limited demolition work if commissioned (mid-range estimate).
Secure Transport And Storage $85K
[#21] Secure containers, air-gapped drives and procedures for transport/storage for a major recovery operation (per-operation estimate mid-range).
Medical Equipment $30K
[#19] One-time purchase of medevac readiness equipment, trauma kits and supplies.
Initial Research And Lab Setup $0
[]
Budget Estimate Examples $0
[#27] Analyst summary ranges: Minimal approach approx $500k–$1M one-time; Full operational approach $1.5M–$6M+ one-time. Not double-counted here (informational).
🔄 Annual Recurring Costs Total: $2.6M/yr
Staff Wages $850K/yr
[#7, #8] Security salaries (local guards + supervisors) and remote monitoring / control-room staff (24/7 shift coverage).
Cover Story And Legal $375K/yr
[#10, #20] Ongoing legal/diplomatic liaison payments, land-access easements and insurance/indemnity costs (combined ongoing legal & insurance).
Logistics And Transport $330K/yr
[#5, #6, #21] Vehicle operating costs (fuel/maintenance), contracted air support retainer/hours, and secure-transport readiness/standing courier contracts.
Contingency Replenishment $250K/yr
[#18] Annual replenishment to maintain contingency/reactivation fund readiness.
Administrative Overhead $180K/yr
[#25] Program management, accounting, compliance and HQ administrative support.
Digital Expungement $125K/yr
[#13] Webcrawler maintenance, hosting, analysts and takedown operations (development + ongoing hosting/analyst costs).
Information Operations $125K/yr
[#14] Ongoing content distribution, PR management and social media maintenance to sustain cover narratives.
Cultural And Ethical Mitigation $85K/yr
[#24] Ongoing cultural mitigation budgets: scholarships, indigenous liaisons, educational programmes and hires.
Consultancy Linguists Archivists $80K/yr
[#16] On-call consultancy for translations, provenance checks and archival redaction support.
Community Relations And Compensation $60K/yr
[#11] Ongoing local payments, development projects or hush/compensation disbursements.
Research And Monitoring $50K/yr
[#9] Periodic structural/environmental inspections, drone surveys, geotechnical and air-quality monitoring (ongoing inspection budget).
Medical And Evacuation $50K/yr
[#19] Medevac contract premiums, periodic medical checks and consumables replenishment.
Long Term Site Caretaking $30K/yr
[#23] Vegetation control, signage replacement and seasonal repairs to maintain clear perimeter.
Facilities Maintenance $25K/yr
[#4, #3] Maintenance for power infrastructure (batteries/solar/gen set) and ruggedised sensor/camera upkeep.
Supplies And Consumables $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $2.6M/yr
92.0% probability / year
Normal uneventful year with ongoing perimeter security, monitoring, legal cover and information operations but no major incidents.
no breaches routine maintenance ongoing archival suppression
🚨 Minor Incident $2.9M/yr
6.0% probability / year +$300K vs baseline
Localized event (trespass, small leak or discovery) requiring rapid-response field ops, targeted archival takedowns and extra legal/PR work.
trespass or media tip targeted archival exposure small-scale recovery operation
🚨 Major Breach Or Demolition $6.6M/yr
2.0% probability / year +$4.0M vs baseline
Major political incident, decision to demolish/stabilise ruins or a large-scale exposure requiring demolition, emergency diplomatic response and global archival suppression.
political exposure decision to demolish ruins large-scale archival disclosures
👥 Personnel 21 total
Role Count Notes
Security Officer / Local Guard 12 [#7] Local guard force providing 24/7 perimeter coverage; estimate based on 12 guards.
Security Supervisor / Field Chief 3 [#7] Supervisory cadre and specialized Foundation security presence.
Remote Monitoring Analyst / Technician 4 [#8] Control-room staff/analysts to triage CCTV and sensor feeds with 24/7 shift rotations.
Site Director / Executive Staff 1 [#25] Program lead responsible for liaison, reporting and high-level coordination.
Medical Officer 1 [#19] On-call medical/evacuation coordinator and medevac liaison for remote operations.
📋 Confidence Notes
Estimates are mid-range selections from wide analyst ranges; many items (diplomatic, archival and demolition costs) have large jurisdictional/political variance, so totals are approximate but grounded in presented ranges.
← SCP-5579 ↑ All SCPs SCP-5581 →