SCP-5600
Unknown
~
medium confidence
SCP-5600
Expected annual
$8.5M
One-time setup
$26.8M
Annual recurring
$8.3M
Personnel
50
Initial one-time capital/setup is approximately $26.8M driven primarily by contingency reserves, initial R&D and long-term program funding, land easements, and infrastructure; annual recurring operations are about $8.34M/yr driven chiefly by security and scientific staffing, plus maintenance, legal/cover-story, logistics, and monitoring.
One-Time Capital Costs
Total: $26.8M
Annual Recurring Costs
Total: $8.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.3M/yr
Normal year with no major incidents: steady operations, routine maintenance, training, and research activity.
no_breach
routine_maintenance
normal_staff_rotations
🚨
Minor Incident
$8.6M/yr
Localized trespass or small object ejection requiring targeted response, forensics, and PR mitigation.
unauthorized_entry_attempt
small_object_exit
local_media_attention
🚨
Major Breach
$11.3M/yr
Significant breach or larger artifact ejection requiring large-scale containment, remediation, and replacement of equipment/staff surge.
multiple_object_exits
casualties_or_mass_exposure
extensive_equipment_loss
🚨
Political Exposure
$10.3M/yr
Media/political exposure forcing large legal, PR, and settlement expenditures and extended interagency costs.
FOIA_or_media_exposure
local_political_pressure
official_investigation
Personnel
50 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 40 | [#4] Operational 24/7 guard coverage, patrols and checkpoints for the exclusion zone (40 operational personnel as specified). |
| Research Scientist | 6 | [#13] Physicists/temporal researchers included in the ~10 scientific staff complement; majority classified as research scientist roles. |
| Technician | 3 | [#13] Lab and field technicians to maintain sensors, robotics, and process samples (part of the ~10 scientific staff). |
| Site Director / Executive Staff | 1 | [#13] Senior technical/administrative lead included within scientific staffing estimate. |
Confidence Notes
Analyst notes provide detailed line-item estimates and explicit baselines for many items (staffing, equipment, contingencies), but several large items (R&D, contingency reserves, remediation) are intentionally speculative and locally variable; therefore medium confidence in magnitudes but not precise upper/lower bounds.