SCP-5688
Euclid
?
low confidence
SCP-5688
Expected annual
$7.9M
One-time setup
$19.8M
Annual recurring
$7.5M
Personnel
21
One-time setup is dominated by stabilizer R&D, liability escrow and specialized containment buildout (~$20M). Recurring costs (~$7.53M/yr) are driven by staff wages, reserves/top-ups, stabilizer maintenance and high uncertainty contingency funds.
One-Time Capital Costs
Total: $19.8M
Annual Recurring Costs
Total: $7.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.5M/yr
Normal year with no large containment incidents; ongoing maintenance, staffing, reserves and expected repair budget only.
no major destabilizations
routine maintenance and planned research
🚨
Minor Incident
$7.8M/yr
One localized destabilization requiring emergency repairs, increased power/fuel use and short-term external contracting.
localized containment destabilization
equipment replacement and short repairs
🚨
Major Breach
$9.5M/yr
Significant containment failure requiring chamber rebuild, equipment replacement, larger repairs and extended MTF operations.
major destabilization event
structural damage and equipment loss
🚨
Catastrophic Breach
$32.5M/yr
Catastrophic, multi-system failure requiring site relocation/rebuild, large payouts and activation of liability escrow.
unbounded destabilization
site-level infrastructure collapse
large-scale evacuations and legal exposure
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#7] Full-time guards posted on containment corridor (6–10 recommended; midpoint used). |
| MTF Standby / Quick Reaction | 4 | [#7] Dedicated MTF/standby capability accounted for in staffing and readiness costs. |
| Research Scientist | 4 | [#8] Scientists involved in monitoring, experiment design and oversight (3–6 recommended). |
| Research Technician | 3 | [#8] Technicians for instrument operation, data collection and sample handling (2–3 recommended). |
| Engineer / Maintenance | 2 | [#3, #6] On-site engineers/maintenance staff for stabilizer calibration, remote handling and facility systems. |
Confidence Notes
Costs are order-of-magnitude estimates based on analyst ranges; SCP-5688's anomalous and unpredictable reality-destabilization behavior produces high uncertainty in incident frequency and tail costs, so confidence is low.