SCP-5701
Safe
~
medium confidence
SCP-5701
Expected annual
$222K
One-time setup
$69K
Annual recurring
$218K
Personnel
3
One-time setup costs are modest (secure locker, safe, CCTV, initial transfers and permits) totaling roughly $69k; main recurring drivers are staff wages, legal/ethics oversight, contingency reserves and IT/records storage totaling ~ $218k/yr.
One-Time Capital Costs
Total: $69K
Annual Recurring Costs
Total: $218K/yr
Cost Scenarios
📊
Baseline
(baseline)
$218K/yr
Normal, uneventful year with standard operations, maintenance, oversight and no major incidents.
no_leaks
routine_audits
standard_transfers
🚨
Minor Incident
$253K/yr
Localized unauthorized photo leak or discovery of an unlogged SCP-5701-# requiring covert retrieval, limited legal action and counseling.
unauthorized_photo_leak
small_retrieval_op
limited_legal_action
🚨
Major Breach
$378K/yr
Significant exposure or deliberate exploitation requiring major legal response, large covert operations, equipment replacement and intensive remediation.
public_exposure
large_scale_data_leak
multi-site_response
🚨
Political Exposure
$318K/yr
Exposure escalates to political/public attention requiring heavy legal, PR, and covert denial/cleanup costs plus extended oversight.
media_or_political_leak
legal_subpoenas
extended_cover_operations
Personnel
3 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 1 | [#5] ~0.5–1.0 FTE security-equivalent allocated to SCP-5701 duties (costed as ~ $37,500/yr incremental). |
| Site Technician / Maintenance | 1 | [#6] Part-time technician (0.25–0.5 FTE equivalent) for inventory checks and maintenance (costed as ~ $20,000/yr). |
| Research Scientist (mothballed capacity) | 1 | [#20] Small retained researcher allocation for forensic/image analysis capacity (fractional FTE, costed as ~ $15,000/yr). |
Confidence Notes
Notes provide detailed line items and reasonable ranges for equipment, recurring staffing and oversight, so estimates are moderately well-grounded; uncertainty remains around incident probabilities, number/cost of incinerations, and chosen contingency posture, so confidence is not high.